1.2.3 Determine Cost and Schedule<br />

Activity<br />

Description<br />

Required<br />

Practices<br />

Parameters<br />

and Limits<br />

Optional<br />

Practices<br />

A top-level cost breakdown and schedule are developed and included in the<br />

plan.<br />

• Estimate the duration of key events as a basis <strong>for</strong> deriving a<br />

comprehensive schedule.<br />

• Estimate the ef<strong>for</strong>t required <strong>for</strong> the people participating in the appraisal.<br />

• Estimate the costs associated with using facilities and equipment (as<br />

appropriate).<br />

• Estimate the costs <strong>for</strong> incidentals (e.g., travel, lodging, meals) as<br />

appropriate.<br />

• Document detailed schedule estimates in the appraisal plan.<br />

• Document detailed cost estimates in the appraisal plan.<br />

Ef<strong>for</strong>t estimates should be developed not only <strong>for</strong> the appraisal team, but also<br />

<strong>for</strong> the expected participants within the organizational unit (e.g., interviewees,<br />

respondents to instruments administered, attendees at briefings, support staff).<br />

Scheduling <strong>for</strong> each day of the appraisal is required.<br />