ARC ID ARC Requirement MDD <strong>Process</strong> MDD Activity Notes/Comments<br />

4.5.4.c (AB) At least one of the two data points must reflect work actually<br />

being done (e.g., process area implementation).<br />

2.2 Verify and Validate<br />

Objective Evidence<br />

2.2.1 Verify Objective<br />

Evidence<br />

In <strong>SCAMPI</strong> v1.1, this is addressed by requirements<br />

<strong>for</strong> a direct artifact from each<br />

project <strong>for</strong> each practice (2.2.1). Affirmations<br />

also reflect work being done, but are not necessarily<br />

required from each project <strong>for</strong> each<br />

practice; affirmations are used to corroborate<br />

direct artifacts.<br />

4.5.5 The method shall require a mechanism <strong>for</strong> determining that<br />

sufficient data has been collected to cover the scope of the appraisal,<br />

according to the following minimum set of rules:<br />

4.5.5.a<br />

4.5.5.a.1<br />

2.2 Verify and Validate<br />

Objective Evidence<br />

(A) A specific or generic practice has sufficient data coverage if 2.2 Verify and Validate<br />

validated observations exist <strong>for</strong> the practice and<br />

Objective Evidence<br />

are adequate to understand the extent of implementation of the<br />

practice<br />

2.2 Verify and Validate<br />

Objective Evidence<br />

4.5.5.a.2 are representative of the organizational unit 2.2 Verify and Validate<br />

Objective Evidence<br />

4.5.5.a.3<br />

4.5.5.b<br />

4.5.5.c<br />

are representative of the life-cycle phases in use within the<br />

organizational unit<br />

2.2 Verify and Validate<br />

Objective Evidence<br />

(A) In a staged representation, a process area has sufficient data 2.2 Verify and Validate<br />

coverage if all of its specific and generic practices have sufficient<br />

data coverage.<br />

Objective Evidence<br />

(A) In a continuous representation, a process area has sufficient 2.2 Verify and Validate<br />

data coverage if all of its specific practices and the generic Objective Evidence<br />

practices within the appraisal scope have sufficient data coverage<br />

up through the capability level being investigated <strong>for</strong> the<br />

process area (e.g., the target capability level).<br />

4.5.6 (A) The method shall require a mechanism <strong>for</strong> consolidating<br />

observations into draft findings of strengths and weaknesses<br />

relative to the appraisal reference model.<br />

2.2 Verify and Validate<br />

Objective Evidence<br />

2.2.1 Verify Objective<br />

Evidence<br />

2.2.1 Verify Objective<br />

Evidence<br />

2.2.1 Verify Objective<br />

Evidence<br />

2.2.1 Verify Objective<br />

Evidence<br />

2.2.1 Verify Objective<br />

Evidence<br />

2.2.1 Verify Objective<br />

Evidence<br />

2.2.1 Verify Objective<br />

Evidence<br />

3.7.3 Validate Practice<br />

Implementation Gaps<br />

Coverage is addressed by requirements <strong>for</strong><br />

objective evidence from each project <strong>for</strong> each<br />

practice (2.2.1). See also 1.5.3, Replan Data<br />

Collection, <strong>for</strong> collection of additional objective<br />

evidence necessary to obtain sufficient<br />

coverage.<br />

See 3.1.3 <strong>for</strong> selection of instantiations representative<br />

of the organizational unit.<br />

See also descriptions of documenting objective<br />

evidence in 3.8, and rating in 3.9.<br />

Preliminary findings are described in 3.7.3.<br />

III-26<br />

CMU/SEI-2001-HB-001