07.09.2014 Views

January 2012 - Sandwell & West Birmingham Hospitals

January 2012 - Sandwell & West Birmingham Hospitals

January 2012 - Sandwell & West Birmingham Hospitals

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Trust Objectives 2011/12<br />

SWBTB (1/12) 266 (a)<br />

Ref. Objective Measure of Success Baseline<br />

(2010/11)<br />

1.3 Deliver Access performance<br />

measures including those set out<br />

in the Operating Framework for<br />

2011/12.<br />

RB<br />

<br />

<br />

Improve flow of information and<br />

communication between hospital<br />

doctors and GPs.<br />

New A&E standards.<br />

Not available<br />

Not available<br />

Not available<br />

Not available<br />

Not available<br />

96.99%<br />

Summary Position as at end of Quarter<br />

Three (December 2011)<br />

A/E Clinical Quality Indicators:<br />

- Total time (hrs:mins) in Dep’t (95 th centile)<br />

Actual 4:02 (Q3) (Target

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!