SWBTB (1/12) 286 (a)<br />

the service model and the benefits of each and would not at this stage take into account<br />

which site the acute services would be placed on.<br />

In addition it was agreed that Options 1a (Do Nothing) and 1 b (Retain the current<br />

configuration but introduce new ways of working for medical teams in order to provide<br />

acceptable levels of cover at all times) would not be scored as they did not meet the clinical<br />

drivers for change in terms of consolidating acute stroke and TIA services in order to provide<br />

the critical mass of expertise and skills that could meet the standards in a consistent was and<br />

deliver improved clinical outcomes.<br />

The short listing process, including the long list of options to be scored and the evaluation<br />

criteria, was discussed with the local Joint Health Scrutiny Committee in September 2011.<br />

6.2.1 Short-listing Scoring Criteria<br />

The criteria for evaluating the long list of options in order to identify a short list, were initially<br />

developed by staff through a Listening into Action style event. These were then refined by the<br />

Project Steering Group and Project Board, allocated weightings and tested with the Joint<br />

Health Scrutiny Committee.<br />