SWBAC (12/11) 068<br />
this would form part of the creditor payment review, however this may be<br />
considered as a specific piece of work as part of the next year’s<br />
programme.<br />
5.4 Internal Audit self‐assessment against Key Performance Indicators<br />
SWBAC (12/11) 059<br />
SWBAC (12/11) 059 (a)<br />
Mr Capener presented a self‐assessment of performance against a number<br />
of key performance indicators for Internal Audit. He highlighted a ‘hot spot’<br />
in terms of management response times. The Committee was informed<br />
that currently, 76% of draft reports were issued within 10 days of the exit<br />
meeting, which needed to be improved to achieve the target of 90%. Mr<br />
Capener advised that this was a challenging target to meet and that current<br />
performance was of a level similar to that in other organisations.<br />
Dr Sahota noted that on occasion, issuing the final reports had also taken<br />
longer than the desired time. Mr Capener advised that this was reflective<br />
of the cases where a more complex management response was required<br />
and the need for Executive Directors to sign off the reports. Mr Capener<br />
was asked to detail the cases that had taken the longest to issue in the next<br />
update.<br />
Professor Alderson asked for an explanation as to how the post audit<br />
questionnaires were used. Mr Capener explained that a set of questions<br />
would be presented to the responsible manager which covered the key<br />
processes undertaken as part of the audit. The Committee was informed<br />
that any negative responses received as part of the questionnaire were<br />
followed up. Mrs Hunjan asked what the current response rate was and<br />
whether it represented an improvement on the position in previous years.<br />
Mr Capener offered to determine the position.<br />
ACTION:<br />
ACTION:<br />
Mr Capener to include a list of final review responses that<br />
had taken the longest time to issue in the next Internal<br />
Audit progress update<br />
Mr Capener to determine the response rates to post‐audit<br />
questionnaires and to assess whether this represented an<br />
improvement on the position from previous years<br />
5.5 Counter Fraud progress report, including an update on open cases<br />
SWBAC (12/11) 065<br />
SWBAC (12/11) 065 (a)<br />
Mr <strong>West</strong>wood reported that training in counter fraud continued to be<br />
delivered to staff on induction and during the year 415 individuals had<br />
been trained in this way.<br />
Eight counter fraud cases were highlighted to have been carried forward<br />
from the previous year, with 13 new investigations having been referred.<br />
Reasonable progress against the Counter Fraud plan was reported and it<br />
was noted to be on track for delivery by the year end.<br />
Page 5