<strong>MAN</strong> B&W 2.04<br />
Line 6:<br />
Propeller curve, clean hull and calm weather<br />
– light running, used for propeller layout/design<br />
(i = 3).<br />
Line 7:<br />
Represents the maximum power for c<strong>on</strong>tinuous<br />
operati<strong>on</strong> (i = 0).<br />
Limits for overload operati<strong>on</strong><br />
The overload service range <str<strong>on</strong>g>is</str<strong>on</strong>g> limited as follows:<br />
Line 8:<br />
Represents the overload operati<strong>on</strong> limitati<strong>on</strong>s.<br />
The area between lines 4, 5, 7 and the heavy<br />
dashed line 8 <str<strong>on</strong>g>is</str<strong>on</strong>g> <str<strong>on</strong>g>available</str<strong>on</strong>g> for overload running for<br />
limited periods <strong>on</strong>ly ( hour per 2 hours).<br />
Line 9:<br />
Speed limit at sea trial.<br />
The area between lines 4, 5, 7 and the heavy<br />
dashed line 8 <str<strong>on</strong>g>is</str<strong>on</strong>g> <str<strong>on</strong>g>available</str<strong>on</strong>g> for overload running for<br />
limited periods <strong>on</strong>ly ( hour per 2 hours).<br />
Limits for low load running<br />
As the fuel injecti<strong>on</strong> and exhaust gas valve timing<br />
are optim<str<strong>on</strong>g>is</str<strong>on</strong>g>ed automatically over the entire<br />
power range, the engine <str<strong>on</strong>g>is</str<strong>on</strong>g> able to operate down<br />
to around 5% of the nominal L speed.<br />
Recommendati<strong>on</strong><br />
Page 3 of<br />
C<strong>on</strong>tinuous operati<strong>on</strong> without limitati<strong>on</strong>s <str<strong>on</strong>g>is</str<strong>on</strong>g> allowed<br />
<strong>on</strong>ly within the area limited by lines 4, 5, 7<br />
and 3 of the load diagram, except for CP propeller<br />
plants menti<strong>on</strong>ed in the previous <str<strong>on</strong>g>secti<strong>on</strong></str<strong>on</strong>g>.<br />
The area between lines 4 and <str<strong>on</strong>g>is</str<strong>on</strong>g> <str<strong>on</strong>g>available</str<strong>on</strong>g> for<br />
operati<strong>on</strong> in shallow waters, heavy weather and<br />
during accelerati<strong>on</strong>, i.e. for n<strong>on</strong>�steady operati<strong>on</strong><br />
without any strict time limitati<strong>on</strong>. After some<br />
time in operati<strong>on</strong>, the ship’s hull and propeller<br />
will be fouled, resulting in heavier running of the<br />
propeller, i.e. the propeller curve will move to the<br />
left from line 6 towards line 2, and extra power <str<strong>on</strong>g>is</str<strong>on</strong>g><br />
required for propulsi<strong>on</strong> in order to keep the ship’s<br />
speed.<br />
In calm weather c<strong>on</strong>diti<strong>on</strong>s, the extent of heavy<br />
running of the propeller will indicate the need for<br />
cleaning the hull and possibly pol<str<strong>on</strong>g>is</str<strong>on</strong>g>hing the propeller.<br />
Once the specified MCR (and the matching point)<br />
have been chosen, the capacities of the auxiliary<br />
equipment will be adapted to the specified MCR,<br />
and the turbocharger specificati<strong>on</strong> and the compressi<strong>on</strong><br />
ratio will be selected.<br />
If the specified MCR (and/or the matching point)<br />
<str<strong>on</strong>g>is</str<strong>on</strong>g> to be increased later <strong>on</strong>, th<str<strong>on</strong>g>is</str<strong>on</strong>g> may involve<br />
a change of the pump and cooler capacities,<br />
change of the fuel valve nozzles, adjusting of the<br />
cylinder liner cooling, as well as rematching of the<br />
turbocharger or even a change to a larger size of<br />
turbocharger. In some cases it can also require<br />
larger dimensi<strong>on</strong>s of the piping systems.<br />
It <str<strong>on</strong>g>is</str<strong>on</strong>g> therefore of utmost importance to c<strong>on</strong>sider,<br />
already at the project stage, if the specificati<strong>on</strong><br />
should be prepared for a later power increase.<br />
<str<strong>on</strong>g>Th<str<strong>on</strong>g>is</str<strong>on</strong>g></str<strong>on</strong>g> <str<strong>on</strong>g>is</str<strong>on</strong>g> to be indicated in the Extent of Delivery.<br />
<strong>MAN</strong> B&W ME/ME-C/ME-GI engines 198 38 97-3.6<br />