12.07.2015 Views

FY 2010-11 Adopted Budget - Volusia County Government

FY 2010-11 Adopted Budget - Volusia County Government

FY 2010-11 Adopted Budget - Volusia County Government

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Department: Public WorksRoad and BridgeActivity: Road and Bridge OperationsActivity: Road and Bridge OperationsAccount: 7503000Actual<strong>FY</strong>2008-09<strong>Adopted</strong><strong>FY</strong>2009-10Estimated<strong>FY</strong>2009-10<strong>Budget</strong><strong>FY</strong><strong>2010</strong>-<strong>11</strong>Expenditures by CategoryPersonal Services $ 5,124,536 $ 4,960,741 $ 4,587,176 $ 4,867,183Operating Expenses 2,550,347 4,142,926 4,<strong>11</strong>6,795 4,244,100Capital Outlay 236,389 534,000 653,710 768,754Subtotal Operating Expenditures $ 7,9<strong>11</strong>,272 $ 9,637,667 $ 9,357,681 $ 9,880,037Reserves 0 83,479 0 83,479Subtotal Other Operating Expenditures $ 0 $ 83,479 $ 0 $ 83,479Total Operating Expenditures $ 7,9<strong>11</strong>,272 $ 9,721,146 $ 9,357,681 $ 9,963,516Reimbursements 0 0 0 0Net Expenditures $ 7,9<strong>11</strong>,272 $ 9,721,146 $ 9,357,681 $ 9,963,516Expenditures by Fund<strong>County</strong> Transportation Trust $ 7,9<strong>11</strong>,272 $ 9,721,146 $ 9,357,681 $ 9,963,516Number of Full Time Positions <strong>11</strong>5.00 108.00 108.00 108.00Number of Part Time Positions 4.00 4.00 4.00 4.00Number of Full Time Equivalent Positions <strong>11</strong>7.00 <strong>11</strong>0.00 <strong>11</strong>0.00 <strong>11</strong>0.00Key Objectives1. Redefine existing levels of service in order to improve efficiency and to better utilize resources2. Work strenuously to maintain an acceptable, safe, level of service with a constricted budgetPerformance MeasuresActual<strong>FY</strong> 2008-09Estimated<strong>FY</strong> 2009-10<strong>Budget</strong><strong>FY</strong> <strong>2010</strong>-<strong>11</strong>1. Number of hours to grade all dirt roads 3,289.00 3,720.00 3,720.002. Cost to grade dirt roads per mile 159.37 153.58 153.583. Number of Acres Mowed 6,975.00 7,500.00 7,760.00HighlightsIn <strong>FY</strong> 2009-10, budget cuts to personnel, materials and equipment required Road and Bridge to reduce their levels of service to thecitizens of <strong>Volusia</strong> <strong>County</strong>. Further reductions in personnel, proposed for <strong>FY</strong> <strong>2010</strong>-<strong>11</strong>, require additional reductions in level of service.Previously, the gateways and thoroughfare roads were mowed eight times per year. In <strong>FY</strong> 2008-09, this was reduced to six times peryear. In <strong>FY</strong> 2009-10 this was reduced to five times per year. Previously, dirt roads were graded every ten days. In <strong>FY</strong> 2008-09, this wasreduced to every twenty one days. In <strong>FY</strong> 2009-10, it was reduced to every twenty eight days. Repair of sidewalks has been reduced totrip hazards only. In <strong>FY</strong> <strong>2010</strong>-<strong>11</strong>, every effort will be made to not further reduce these levels of service. The <strong>FY</strong> <strong>2010</strong>-<strong>11</strong> budget includes<strong>11</strong> unfunded positions.<strong>Volusia</strong> <strong>County</strong> Section F - 342

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!