09.03.2013 Views

PAO Accredited Laboratories (as of Dec. 2012) - DTI

PAO Accredited Laboratories (as of Dec. 2012) - DTI

PAO Accredited Laboratories (as of Dec. 2012) - DTI

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

192. TUV RHEINLAND PHILIPPINES, INC. – PHILIPPINE LABORATORY<br />

Address : Unit 8, La Fuerza Plaza I, 2241 Don Cheno Roces Ave., 1231<br />

Makati City, Philippines<br />

Telephone No. : (632) 812-5339/ 812-5147<br />

Fax No. : (632) 812-5227<br />

E-mail : psq@phl.tuv.com or Tristan.Loveres@phl.tuv.com<br />

Authorized Representative : Mr. Tristan Arwen G. Loveres<br />

Manager, GB Products<br />

Accreditation No. Field <strong>of</strong> Testing<br />

LA-2009-158A Electrical Testing<br />

Validity: 06 <strong>Dec</strong>ember 2014<br />

Products/<br />

Cl<strong>as</strong>s <strong>of</strong> Test<br />

Specific tests or<br />

Me<strong>as</strong>urements<br />

375 <strong>of</strong> 391<br />

Standard Method/<br />

Reference Standard<br />

3.37 Approval tests on electrical appliances, accessories and tools<br />

Electric Irons<br />

Clause 7 Markings and instruction<br />

PNS 1079:1994<br />

(Except pressurized<br />

steam Iron)<br />

Clause 8 Protection against access to live part<br />

Clause 10 Power Input and current<br />

(IEC 335-1:1991)<br />

Clause 11 Heating PNS 254-1:1994<br />

Clause 13 Leakage current and electric strength at<br />

operating temperature<br />

Clause 15 Moisture resistance<br />

Clause 16 Leakage current and electric strength<br />

Clause 17 Overload protection <strong>of</strong> transformers and<br />

<strong>as</strong>sociated circuits<br />

Clause 18 Endurance<br />

Clause 19 Abnormal operation<br />

Clause 20 Stability and mechanical hazard<br />

Clause 21 Mechanical strength<br />

Clause 22 Construction<br />

Clause 23 Internal wiring<br />

Clause 25 Supply connection and external flexible cords<br />

Clause 26 Terminals for external conductors<br />

Clause 27 Provision for earthing<br />

Clause 28 Screws and connections<br />

Clause 29 Creepage distances, clearances and distances<br />

through insulation<br />

Clause 30 Resistance to heat and fire<br />

Clause 31 Resistance to rusting<br />

Clause 32 Radiation, toxicity and similar hazards<br />

(IEC 335-2-3:1993)<br />

W<strong>as</strong>hing machine Clause 7 Markings and instruction PNS 1079:1994<br />

Clause 8 Protection against access to live part<br />

Clause 10 Power Input and current<br />

(IEC 335-1:1991)<br />

Clause 11 Heating PNS IEC 60335-2-<br />

Clause 13 Leakage current and electric strength at<br />

7:2000<br />

operating temperature<br />

Clause 15 Moisture resistance<br />

Clause 16 Leakage current and electric strength<br />

Clause 17 Overload protection <strong>of</strong> transformers and<br />

<strong>as</strong>sociated circuits<br />

Clause 19 Abnormal operation<br />

Clause 20 Stability and mechanical hazard<br />

Clause 21 Mechanical strength<br />

Clause 22 Construction<br />

Clause 23 Internal wiring<br />

Clause 25 Supply connection and external flexible cords<br />

Clause 26 Terminals for external conductors<br />

Clause 27 Provision for earthing<br />

Clause 28 Screws and connections<br />

Clause 29 Creepage distances, clearances and distances<br />

through insulation<br />

Clause 30 Resistance to heat and fire<br />

Clause 31 Resistance to rusting<br />

(IEC 335-2-7:1993)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!