Meeting Minutes - US Department of State
Meeting Minutes - US Department of State
Meeting Minutes - US Department of State
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
21<br />
22<br />
23<br />
24<br />
25<br />
not here, working together with the industry to come<br />
up with ideas to make better value for our projects.<br />
We do that as well.<br />
And we also have an analysis on lessons<br />
learned component to our program. And this is where<br />
I start to get into what is new in value<br />
engineering. We do something called a VE assessment<br />
trip and we also have a database <strong>of</strong> every VE<br />
alternative that has ever been made during our<br />
program. So we can analyze trends and get into<br />
lessons learned or into the said change request<br />
program, ways <strong>of</strong> improving our designs for future.<br />
What I'm hoping for with the program is to bring the<br />
return on investment down, especially if we're<br />
building similar buildings. We shouldn't be seeing<br />
a trend upwards, we should be seeing a trend<br />
downward as we improve on our process.<br />
The next slide is the typical overview <strong>of</strong><br />
our VE study schedule. I know I think that some <strong>of</strong><br />
you may have seen this before, but we follow the<br />
same thing that SAVE International recommends in<br />
terms <strong>of</strong> how we do value engineering. A little bit<br />
different is our post-study in our approval<br />
implementation and database <strong>of</strong> alternatives and<br />
results. That's slightly different than what SAVE<br />
Free <strong>State</strong> Reporting, Inc.<br />