Assessing the risks related to the project<br />

Table 7 Consequences related to maritime accident scenarios<br />

Accident<br />

Reference LNG tanker<br />

scenarios<br />

(160,000 m 3 Qflex LNG tanker<br />

)<br />

(216,000 m 3 )<br />

250 mm tank breach: the most credible accidental puncture<br />

Distance from the<br />

5 kW/m 2 level for the<br />

steady-state pool<br />

194 m 210 m<br />

Distance from the<br />

5 kW/m 2 level for the<br />

Initial spill pool<br />

359 m 390 m<br />

Distance to the<br />

flammability limit<br />

330 m 360 m<br />

750 mm tank breach: maximum credible scenario for accidental events<br />

Distance from the<br />

5 kW/m 2 level for the<br />

steady-state pool<br />

450 m 480 m<br />

Distance from the<br />

5 kW/m 2 level for the<br />

initial spill pool<br />

870 m 910 m<br />

Distance to the<br />

flammability limit<br />

1,000 m 1,100 m<br />

1,500 mm breach: maximum credible scenario for intentional acts<br />

Distance from the<br />

5 kW/m 2 level for the<br />

steady-state pool<br />

790 m 820 m<br />

Distance from the<br />

5 kW/m 2 level for the<br />

initial spill pool<br />

Distance to the<br />

flammability limit<br />

Source: adapted from PR5.3.2, p. 7.<br />

Sensitive elements of the project’s zone<br />

1,500 m 1,570 m<br />

2,100 m 2,200 m<br />

The collision or grounding of a loaded LNG tanker could result in an LNG pool that<br />

could ignite, thus producing thermal radiation. In the course of the hearing, many<br />

participants expressed concern in regard to the possibility and potential<br />

consequences of such an accident occurring in front of île d’Orléans or in the<br />

approach area of the proposed terminal.<br />