22.08.2013 Views

Report - Agence canadienne d'évaluation environnementale

Report - Agence canadienne d'évaluation environnementale

Report - Agence canadienne d'évaluation environnementale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Job creation<br />

Opinions of participants<br />

The Société de développement économique de Lévis, as well as many participants,<br />

underscored the importance of this project’s job creation component, specifically<br />

during the construction phase which would span more than three years 1 . Other<br />

participants evoked the diversity of jobs required to build an LNG terminal, which will<br />

include “not only construction workers, but also many technicians and engineers who<br />

will be assigned exclusively to work monitoring and quality control duties for the entire<br />

building duration” (Inspec-Sol, DM62, p. 2). Moreover, the Fédération des chambres<br />

de commerce du Québec was of the opinion that direct and indirect job creation<br />

related to the project could in some way diminish the impacts that affected some parts<br />

of the region’s social-economic community (Ms. Françoise Bertrand, DT15, p. 53).<br />

Several participants highlighted the fact 2 that quality jobs would be created and that<br />

the proponent would favour the hiring of local workers. For Développement PME<br />

Chaudière-Appalaches, “the arrival of a jobsite like Rabaska, with the proponent’s<br />

promise to favour local labour and companies, is therefore a breath of fresh air for our<br />

region’s contractors” (DM607, p. 3). Some participants were preoccupied, however,<br />

about where the required workers to build the LNG terminal will come from, and<br />

suspected that some specialized labour may be called in from outside the region<br />

(Ms. Louise Latulippe, DM196, p. 8). The Groupe Perspective, following the example<br />

of other social-economic stakeholders, demanded a firm commitment on the part of<br />

the proponent “in order to favour our great region’s youth, workers and companies, by<br />

assuming the responsibility for developing the region’s qualified labour” (DM519, p. 5).<br />

1. Quebec Employers’ Council, DM535, p. 3; Cométal inc., DM201, p. 2; Alu-Rex inc., DM208, p. 1; Métallurgie<br />

Pelchat inc., DM227, p. 1; Lucien Fournier et fils, DM230, p. 1; Excavation B. Bilodeau, DM246, p. 1; Transport<br />

d’agrégats du Québec inc., DM289, p. 6; Mr. Philippe Martel, DM69, p. 3; Mr. Jasay Bernard, DM212, p. 2;<br />

Mr. Paul Ferron, DM482, p. 2; Mr. Guy Boissonneault, DM491, p. 1; Mr. Pierre Paré, DM83, p. 2; Mr. Michel<br />

Brochu, DM86, p. 1; Mr. Marc Duguay, DM90, p. 1; Mr. Guy Duguay, DM107; Ms. Ghislaine Mr. Durepos,<br />

DM122; Ms. Carole Goudreault, DM127; Mr. Jean-François Dion, DM130; Ms. Rachel Chabot-Moisan, DM171,<br />

p. 2; Ms. Anette Roy, DM176; Mr. Éric Simoneau, DM219, p. 4; Mr. Daniel Lachance, DM236; Ms. Maude<br />

Laflamme, DM248; Mr. Émile Laflamme, DM251; Mr. Robert Brisebois, DM254; Mr. Alain Roy, DM255, p. 2;<br />

Mr. Guy Lachance, DM258; Mr. Frédéric Lachance, DM260; Ms. Sonya Denis, DM261, p. 2; Mr. Martial Fortier,<br />

DM262; Mr. Jacques Legros, DM263; Mr. Pierre Breton, DM264; Ms. Andrée Caron, DM272; Mr. Robert<br />

Grandbois, DM330; Plomberie Y. Beaudoin (2002) inc., DM339, p. 3; Fins Gourmands, DM352; Mr. François<br />

Moulin, DM368, p. 2; Mr. Gaétan Cahier, DM415; Entreprises P. A. Goulet et fils inc., DM474; Mr. Jean-Paul<br />

Drouin, DM481; Mr. Réal Labrecque, DM516, p. 3; Mr. Jean-François Leclerc, DM528; Autobus Auger, DM532;<br />

Ms. Linda Poirier, DM642, p. 2; Ms. Martine Demers, DM643; Mr. Guildo Brisson, DM682; Mr. Gaétan Lapointe,<br />

DM683, p. 1.<br />

2. Cogémat inc., DM2, p. 2; Maxi-Paysage inc., DM5, p. 2 and 3; Pierquip inc., DM178, p. 2; Mr. Luc Castonguay,<br />

DM245; Les membranes Naulin inc., DM453, p. 2; Construction Raoul Pelletier (1997) inc., DM469, p. 2;<br />

Mr. Joel Ouellet, DM541, p. 1.<br />

Rabaska Project – Implementation of an LNG Terminal and Related Infrastructure 41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!