Impacts on the natural environment<br />

♦ Recommendation 20 — The Panel recommends that, subject to an agreement with<br />

Fisheries and Oceans Canada and the ministère des Ressources naturelles et de la<br />

Faune, the proponent determine the water supply sources for the hydrostatic tests on<br />

the pipeline pipes and this, at the environmental assessment phase. This choice<br />

should comply with the minimum ecological instream flow regimes of the bodies of<br />

water concerned. If needed, mitigation or compensation measures should be taken to<br />

reduce impacts on fish habitat.<br />

Potable water wells<br />

The analysis of the project’s impacts on groundwater was conducted by delineating<br />

two areas likely to be affected, namely LNG tanks (area A), where an excavation<br />

exceeding 10 m would be planned, and the access road to the jetty (area B), which<br />

should be excavated in rock north of Highway 132. These areas are shown on<br />

Figure 13. Aside from the potential impact on surface water, the groundwater body<br />

drawdown could affect potable water well levels belonging to residents in the area.<br />

According to the proponent, the aquifer of the basement rock supplying the residents has<br />

only limited natural protection. Only the residents living west of the junction between<br />

Lallemand Road and Highway 132 and those living on rue Jean-de-Brébeuf are served<br />

by the aqueduct and the sewer, while the others rely on individual installations. The<br />

proponent has defined a perimeter of influence where the wells would be likely to undergo<br />

a drawdown exceeding 0.5 m. The perimeter covers approximately 4.5 km 2 .<br />

The groundwater drawdown in area A would be caused by excavation of the access<br />

road to the jetty, including the dynamiting of part of the cliff. According to the<br />

proponent’s analyses, the water level in the wells of some twenty residences could be<br />

influenced by the drainage of the access road to the jetty.<br />

In area B, the groundwater body drawdown would be caused by excavation for the<br />

tanks and pumping to keep their bases dry during the operation phase. In the tank<br />

basin drainage influence perimeter, well levels of some fifteen residences could<br />

experience a drawdown less than 1 m. The same would apply to the Transit<br />

campground located south of Expressway 20 (DA22.1, p. 13).<br />

The proponent has conducted a preliminary characterization of some of the residents’<br />

wells. A more comprehensive inventory as well as a complete portrait of the<br />

groundwater physicochemical and bacteriological quality would be established once<br />

the project is authorized. The proponent committed to following-up on groundwater in<br />

order to ensure that the project does not jeopardize either the availability or the quality<br />

of groundwater for present and future users.<br />

Rabaska Project – Implementation of an LNG Terminal and Related Infrastructure 209