25.10.2012 Views

Instructions for use: Ikus - Berlin Heart

Instructions for use: Ikus - Berlin Heart

Instructions for use: Ikus - Berlin Heart

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6 Start up the <strong>Ikus</strong> and set the parameters<br />

Preparations outside of the operating room<br />

Warning!<br />

• Be<strong>for</strong>e every commissioning of the <strong>Ikus</strong>, you must check that a replacement <strong>Ikus</strong> or<br />

<strong>Berlin</strong> <strong>Heart</strong> GmbH service is available within 24 hours.<br />

• If you are using a laptop of the type Panasonic CF29, always observe the additional<br />

in<strong>for</strong>mation (Section 13.9 on p. 99)!<br />

Caution!<br />

• Always observe a resting period of six hours after each transportation be<strong>for</strong>e switching<br />

on the <strong>Ikus</strong>.<br />

• Be<strong>for</strong>e every commissioning of the <strong>Ikus</strong>, check that the environmental conditions are<br />

respected (see Section 13.2 “Technical specifications” on page 89).<br />

• Always keep un<strong>use</strong>d driving tube connectors closed.<br />

Note<br />

• This chapter describes the technical aspects of comissioning as well as perioperative<br />

and postoperative drive management. During commissioning, always pay attention to<br />

the chapter 8: “Implantation – Surgical procedure”, p. 45.<br />

• The described procedure <strong>for</strong> drive management consists of recommendations. They do<br />

not replace conscientious observation and evaluation by competent personnel.<br />

6.1 Preparations outside of the operating room<br />

•<br />

Warning!<br />

Switch on the <strong>Ikus</strong> two hours be<strong>for</strong>e its planned <strong>use</strong>, so as to charge the batteries<br />

(in particular the laptop battery) sufficiently and to detect a possible device error by<br />

means of the start test. During this period, always connect the vessel models to the <strong>Ikus</strong><br />

(see below).<br />

• The power switch (mains power switch) on the <strong>Ikus</strong> must always remain on ON/EIN –<br />

even in battery mode and when the <strong>Ikus</strong> is switched off! Otherwise, there is a risk of<br />

failure of the driving unit due to completely discharged batteries. The only exception is<br />

battery mode: Be<strong>for</strong>e switching to battery mode, move the power switch (mains power<br />

switch) to the OFF/Aus [O] position. Immediately after restoring the power connection,<br />

move the power switch back to the ON/Ein [I] position.<br />

• Make sure that the key on the laptop is not activated. The status LED on the<br />

laptop indicated with a lock and/or a number (e.g. “1”) should not light up.<br />

1 2 3<br />

8<br />

Connection panel<br />

7 6 5<br />

1000002 Rev. 4.9.1 31<br />

4<br />

4<br />

1. Driving tube connectors<br />

2. Battery f<strong>use</strong><br />

3. Mains power indicator<br />

4. Power switch (mains power switch)<br />

5. Mains power connector<br />

6. Main switch (key switch; O/I)<br />

7. Potential equalization connection<br />

8. External alarm connector (nurse call)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!