10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4 – Waste disposal PackagesLoadSlidingrunnerFigure 4.2.9 Sliding runner test bench Figure 4.2.10 Loaded sliding runnerTests carried out with a solid ceramic sliding runner demonstrated that the metal track underwentslight marking without metal detachment <strong>and</strong> that the load required for pushing was steady <strong>and</strong>stabilised at a value <strong>of</strong> half <strong>of</strong> the displaced weight, i.e. a friction factor <strong>of</strong> 0.5.For this type <strong>of</strong> ceramic, the sliding runners are shaped by pressing powder <strong>and</strong> then sintering i.e.raising to high temperatures for consolidation. After cooling, machining is required so that the partcomplies with rated dimensions. The part can be quite complex in shape. The material obtained hashomogenous characteristics with no residual stress.• Method for integrating ceramic sliding runners into disposal packagesIntegration <strong>of</strong> sliding runners in disposal packages must not affect the rated thickness <strong>of</strong> 55 mm <strong>of</strong>steel. This imposes an extra thickness <strong>of</strong> about 10 mm for installation <strong>of</strong> sliding runner emplacements.Two integration methods are possible: (i) direct bonding 47 <strong>of</strong> solid ceramic sliding runners in thesemachined emplacements with defined tolerance to obtain good mechanical resistance (especiallyresistance to shearing stress generated by friction applied to the metal sleeve), (ii) welding <strong>of</strong> slidingrunners <strong>of</strong> composite ceramic/metal type 48 inserted in these emplacements. The advantage <strong>of</strong> themetal part is that it can be welded to the extra steel thickness on the over-pack.4.2.4.3 Disposal package assemblyDisposal packages are assembled in a shielded cell:- The first operation consists <strong>of</strong> loading the primary package <strong>of</strong> vitrified waste into the container.Functional clearance provides ease <strong>of</strong> vertical loading by freeing up container manufacturetolerances <strong>and</strong> tolerances related to the primary package.- The lid is then placed on the container body. The ensemble is then inserted into an enclosurewhere the vacuum is effected, an operation required for electron beam welding. The container isthen rotated <strong>and</strong> orbital welding <strong>of</strong> the lid is carried out. Figure 4.2.11 shows a welding enclosureunder vacuum conditions <strong>and</strong> Figure 4.2.12 the electron beam welding process.4748Using high performance industrial glue.Firstly, solid sintered ceramic is produced then mechanically added to a metal base in order to obtain the composite ceramic/metalsliding runner.DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM142/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!