10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6 – Overall underground architectureFigure 6.6.1<strong>Architecture</strong> principle for the scenario S1aThe total excavated volume is approximately 7.6 million m 3 . This volume is split into 1.9 million m 3(that is, 25 % <strong>of</strong> the total) for the common installations, 1.8 million m 3 (that is, 23 % <strong>of</strong> the total) forthe B wastes, 0.1 million m 3 (that is, 3 % <strong>of</strong> the total) for the C0 wastes <strong>and</strong> 3.8 million m 3 (that is,49 % <strong>of</strong> the total) for the C wastes. This breakdown is shown in Figure 6.6.2.DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM282/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!