10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

11 – Operational SafetyTable 11.5.3Temperatures estimated at the transfer transfer cask, the disposal package <strong>and</strong>the primary package C obtained by digital simulations under fire conditionsMaximumtemperaturereached (°C)Time to reach Tmax fromthe outbreak <strong>of</strong> the fireExternal surface 1410 ~ 1 hTransfer transferPlaster polyethylene boron 1347 ~ 1 hcaskInternal surface 71 ~ 4 hDisposal package According to the surface 70 ~ 23 hPrimary packageContainer body 71 to 83 from 23 h to 27 hWastes 92 ~ 30 hConsidering the fire’s temperatures, the transfer cask may be affected by steel creep phenomena <strong>and</strong>PPB adhesion defects. This would necessitate checking the radiological protection level beforeperforming any transfer cask recovery operation.11.5.1.5 Results related to a fire on the transfer transfer cask, the disposal package <strong>and</strong> theassemblies <strong>of</strong> spent fuels (CU1)The results related to the fire on a vehicle transporting a transfer cask <strong>of</strong> spent fuel lead to the samecomments as in the case <strong>of</strong> C waste packages.The thermal stresses would not induce any mechanical consequences on the spent fuel assemblies.There would not be any risk <strong>of</strong> damage because they would only be subject to a rise <strong>of</strong> about15 degrees with respect to their initial temperature.As previously, the results obtained refute the assumption <strong>of</strong> a deterioration <strong>of</strong> the spent fuel packagesprovoking radiological consequences.Table 11.5.4Transfer transfercaskDisposal packageAssembly <strong>of</strong> spentfuelsTemperatures estimated at the tranfer transfer cask, the disposal package <strong>and</strong>the spent fuel (CU1) obtained by numerical simulations under fire conditionsMaximumtemperaturereached (°C)Time to reach Tmax fromthe outbreak <strong>of</strong> the fireExternal surface 1280 ~ 1 hPlaster polyethylene boron 1250 ~1 hInternal surface 271 ~2 hContainer 98 ~4 hInsert 69 ~8 hCladding 67 ~9 hAssembly centre 100 -DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM468/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!