10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The robot is traversed similarly to the robot used for emplacement purposes. The principle consists ina step-by-step forward movement by means <strong>of</strong> a longitudinal cylinder <strong>and</strong> side cylinders. Oneadvantage <strong>of</strong> this system is that it is rather insensitive to a damage sleeve surface condition. It alsoprovides an opportunity to exert a significant thrust if necessary.Pick-up <strong>of</strong> the package top section–a function specific to retrieval operations–is carried out using twovertical hydraulic cylinders located at the head <strong>of</strong> the retrieval carriage which slightly lift the packagetop section to facilitate the retrieval operations (Figure 10.4.12).Figure 10.4.12Pickup <strong>and</strong> retrieval principles <strong>of</strong> disposed packagesThe retrieval winch considered is capable <strong>of</strong> producing a tensile strength <strong>of</strong> about 160 kN for packagesC <strong>and</strong> 800 kN for spent fuel packages. The tensile force is transmitted to the robot <strong>and</strong> to the packageto be retrieved via a multi-cable pulley system.Like for installation, all the operations are carried out semi-automatically under the supervision <strong>of</strong> anoperator located in the control station <strong>of</strong> the docking shuttle by following a reverse procedure fromthat used for installation.10.4.2.3 Retrieval conditions at the “After cell closure” stageThe "after closure" stage corresponds to the configuration in which the cell is sealed by a plug <strong>of</strong>swelling clay mechanically constricted by a concrete plug (Figure 10.4.13). The access drift is stillaccessible.At this stage, package retrieval remains technically feasible. However, like in the previous stage, thisoperation shall be preceded by a cell head section reconditioning phase.DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM429/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!