10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9 – Nuclear operating resources in the <strong>repository</strong>Figure 9.3.21 Prototype air cushioncradleFigure 9.3.22 Tests <strong>of</strong> moving a load simulating theshape <strong>and</strong> weight <strong>of</strong> a type CU1 spent fuel disposalpackage using air cushionsThe second part <strong>of</strong> the test consists <strong>of</strong> producing a full-scale demonstration model. It uses a tubetwenty metres long simulating the cell sleeve, a dummy package <strong>of</strong> the same weight <strong>and</strong> dimensionsas a real package <strong>and</strong> a prototype robot. Geometric faults <strong>and</strong> obstacles on the tube will be created tovalidate the correct working <strong>of</strong> the process.9.3.4.5 A similar solution studied in SwedenThe Swedish agency SKB has studied a horizontal disposal concept called KBS-3H, whose principleconsists <strong>of</strong> depositing a super-container (diameter 1.80 m – weight 45 tonnes), consisting <strong>of</strong> a copperspent fuels container surrounded by rings <strong>of</strong> bentonite, in a horizontal tunnel (Figure 9.3.23). As part <strong>of</strong> this concept, the use <strong>of</strong> air cushion technology is envisaged by SKB. Thisprinciple is similar to that envisaged by <strong>Andra</strong>. However, as the irregularities in the tunnel wallsexcavated in granite are likely to require the use <strong>of</strong> very high air flow rates to keep the load suspendedby the air cushion, SKB therefore envisaged replacing the air by water. This project will also be thesubject <strong>of</strong> a full-scale technological demonstration model carried out as part <strong>of</strong> ESDRED projectcoordinated by <strong>Andra</strong>. A first successful test was conducted with the same test bench as that used by<strong>Andra</strong> <strong>and</strong> mentioned previously. [81].Figure 9.3.23Diagram <strong>of</strong> the principle adopted by SKBDOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM363/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!