10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 10.4.13C Cell sealed• Prior cell head section reconditioning processThis process is distinguished from the previous one in that access to the package requires partialdeconstruction <strong>of</strong> the seal <strong>and</strong> reconstruction <strong>of</strong> the cell head section.Like in the previous stage, it starts with the cell atmosphere inspection. However, it shall be carriedout through the seal via a small-diameter bore. For safety purposes, this bore shall be performed in aneutral, air-locked atmosphere. Inspecting the atmosphere then allows to check the cell is incompliance with the expected state.Deconstructing the seal <strong>and</strong> reconditioning the cell head sectionDeconstructing the cell seal consists in removing the seal <strong>and</strong> installing a support casing (Figure10.4.14).The support casing is intended to facilitate later installation <strong>of</strong> the temporary sleeve. Thediameter <strong>of</strong> the support casing is 200 mm larger than that <strong>of</strong> the permanent sleeve to account for a 1%potential deviation <strong>of</strong> the boring axis. This operation may be performed using a horizontal boringmachine (external motor micro tunnel borer <strong>and</strong> retractable tool); installation is carried out when thesupport casing is fitted.Figure 10.4.14C Cell seal boringDOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM430/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!