10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5 – Repository ModulesFigure 5.2.21Welding robot used for welding inside the sleeve (photograph courtesy <strong>of</strong> AirLiquide)• Assessment <strong>of</strong> basic solutionThe total execution time for the disposal cell using the drilling method is estimated at seven 8-hourshifts (total <strong>of</strong> 56 hours) broken down as follows:- thrust bench installation <strong>and</strong> removal: 5 shifts- disposal cell excavation, not including tube connection: 1 shift (40 m at 5 m/h)- miscellaneous (tube connection, cleaning, etc.): 1 shift5.2.5.3 Alternative solution: Microtunneling <strong>and</strong> thrust tubes left in placeIn this alternative solution, the head <strong>of</strong> the hydraulic motor driven microtunneller is pushed using thesleeve. Specific characteristics:- The tool is a retractable full-face boring wheel. Rotation is ensured by a hydraulic motor anchoredto the front end <strong>of</strong> the sleeve via lateral cylinders.Figure 5.2.22 shows industrial equipment used incivil engineering;- The pivoting wheel solution is preferred to the solution consisting <strong>of</strong> ab<strong>and</strong>oning the boring wheelperiphery in the terrain (cleaner <strong>and</strong> more economic).- Broken rocks removal preferably performed using an endless screw.DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM221/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!