10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5 – Repository Modules5.1.5 Construction <strong>of</strong> the B cellsThe construction process can be sub-divided into three basic processes:- excavation,- installation <strong>of</strong> the ground support to ensure that the site is safe,- installation <strong>of</strong> the lining ensuring the stability <strong>of</strong> the structure throughout the operation <strong>and</strong>monitoring periods.Underground work has been carried out for each <strong>of</strong> these processes. At this stage in the studies, onlythe use <strong>of</strong> st<strong>and</strong>ard equipment has been taken into account <strong>and</strong> proven operating methods have beenfavoured.5.1.5.1 Excavation methodSeveral options can be envisaged for excavation <strong>of</strong> the cell: borehole drilling <strong>and</strong> blasting, roadheader<strong>and</strong> full-face tunnelling machine.At this point in the studies, the roadheader machine (Figure 5.1.22) is the preferred option forexcavating the access drift <strong>and</strong> the cell. This technique is well suited to the characteristics <strong>of</strong> theargilite <strong>and</strong> the geometry <strong>of</strong> the cell. By comparison, the full-face tunnelling machine is cumbersome<strong>and</strong> less suited to the configuration <strong>of</strong> the cell owing to its reduced length (about 250 m) <strong>and</strong> thedimensional restriction imposed by the cell entrance chamber. Given the mechanical properties <strong>of</strong> therock <strong>and</strong> the diameter <strong>of</strong> the cell, it may be necessary to excavate the cell in two passes, whereas theentrance drift could be excavated in a single pass. The development <strong>of</strong> a specific roadheader wouldmean the section <strong>of</strong> the cell could be excavated in a single pass.5.1.5.2 Installation <strong>of</strong> the support <strong>and</strong> lining• The cellInstallation <strong>of</strong> the ground support in the cell, consisting <strong>of</strong> short rock bolts, a welded mesh <strong>and</strong>shotcrete, as described in the previous sections, is done with a bolting jumbo (Figure 5.1.22) <strong>and</strong> anelevator platform. The shotcrete is installed with a projection jumbo.The choice <strong>of</strong> method for installing the lining is linked to the support method. It may consist <strong>of</strong>concrete poured in-situ or <strong>of</strong> prefabricated concrete segments. For a bolted support (or one usingarches), the first option should be preferred. It should be noted that if segments are used, the supportfunction will be provided by a shield integral with the excavation machine.Figure 5.1.22Examples <strong>of</strong> roadheader <strong>and</strong> bolting jumboDOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM184/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!