10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9 – Nuclear operating resources in the <strong>repository</strong>Figure 9.1.6Preparation cycle for C waste disposal packagesIt takes three hours on average to manufacture a C waste disposal package. On this basis, a singleconditioning line operating continuously would be necessary to produce an average five disposalpackages per day, with a maximum <strong>of</strong> eight packages.9.1.4 Preparing spent fuel disposal packagesPreparing the spent fuel (UOX, MOX) disposal packages takes place over the following stages:- bringing up empty containers <strong>and</strong> demagnetisation,- loading containers with spent fuel assemblies <strong>and</strong> placing the lid,- welding the closing tape,- welding the lid,- non-contamination check (described in Section 4.3),- weld check (described in Section 4.3),- temporary storage <strong>of</strong> disposal packages before transfer into the underground installations.These operations are performed in a series <strong>of</strong> shielded cells illustrated by the diagram in Figure 9.1.7.DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM334/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!