10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8 – Surface installationsSuch a building would operate permanently twenty-four hours a day for 225 days a year. Forreference, the throughputs considered in the study are:- 5,000 primary B packages per year,- 400 C0 primary packages per year, then 600 or 700 C1 to C4 primary packages per year(according to the scenarios),- production capacity for 1,400 B disposal packages on average per year,- production capacity <strong>of</strong> 600 to 700 C disposal packages per year.8.2.3 Surface building for receiving spent fuel <strong>and</strong> placing it in containersShould spent fuel disposal be considered (UOX <strong>and</strong> MOX), the processing building will have to beextended to receive <strong>and</strong> condition it before transfer to the underground installations. The buildingcould be an extension linked to the previous one.Figure 8.2.2Building for spent fuel8.3 Industrial <strong>and</strong> administrative zonesThe industrial zone covers a surface area <strong>of</strong> around 35 ha. It is organised around the construction shaft.These installations group in particular:- the construction shaft operating buildings;- the workshops for preparing the construction materials (drift liners, etc.);- equipment maintenance <strong>and</strong> repair shops (electrical, hydraulic, mechanical, electro-mechanical,welding, wiring, etc.);- service buildings (warehouses, stores, core library, concrete laboratory, etc.).DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM325/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!