10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

8 – Surface installations8.2.2 Building for receiving B <strong>and</strong> C waste <strong>and</strong> for preparing disposal packagesThe building for receiving the B <strong>and</strong> C waste <strong>and</strong> for preparing disposal packages has three schematicsections:- a zone for unloading the primary waste transport transfer casks,- a zone for manufacturing <strong>and</strong> storing the disposal packages,- a zone for transferring the disposal packages to the transfer shaft.Figure 8.2.1B <strong>and</strong> C waste buildingThe transport transfer cask unloading zone has a travelling crane <strong>and</strong> shielded cells. The primarypackages are extracted from the transfer casks <strong>and</strong> placed in buffer storage before being recovered <strong>and</strong>placed in disposal packages.The zone for manufacturing <strong>and</strong> storing the disposal packages consists <strong>of</strong> several manufacturing lines.Each line is made up <strong>of</strong> a succession <strong>of</strong> shielded cells. Two manufacturing lines are considered for theB disposal packages <strong>and</strong> one line for the C disposal packages.A concreting facility is in particular part <strong>of</strong> the B waste lines so that the concrete containers may beclosed. The full containers are stored temporarily in a curing room until sufficient mechanicalproperties are obtained before transfer to the bottom <strong>of</strong> the shaft (around 28 days).The C waste line has facilities for demagnetisation <strong>and</strong> electron beam welding, so that the lid can bewelded to the over-pack body. The disposal packages are placed in temporary buffer storage.In the shaft transfer zone, the disposal packages are taken to the transfer transfer cask loading station.The transfer transfer cask is then conveyed to the shaft which transfers it to the bottom.All types <strong>of</strong> activities planned for the building are already implemented in similar industrial nuclearfacilities.DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM324/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!