10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7 – The shafts <strong>and</strong> the driftsFigure 7.3.2Section <strong>of</strong> the package transfer shaftThe shaft’s special equipment is detailed in chapter 9. The shaft machinery can transport a payload <strong>of</strong>110 tons at a rate <strong>of</strong> 1 m/s. The cage weight is balanced by a counter-weight. The cage is guided bysteel pr<strong>of</strong>ile guiding systems. A small independent emergency cage ensures the safety <strong>of</strong> the personnelassigned to the maintenance operations.7.3.2 Air exhaust shaftThe purpose <strong>of</strong> the air exhaust shaft is to ensure the general air exhaust from the <strong>repository</strong>(construction <strong>and</strong> operation), the evacuation <strong>of</strong> smoke in case <strong>of</strong> fire <strong>and</strong>, if neessary, the return <strong>of</strong>possibly contaminated air in case <strong>of</strong> an accident (air coming from the package transfer shaft).The need for a dedicated air exhaust shaft can be explained by the very high air flow rates (severalhundred cubic metres per second) <strong>and</strong> by the necessity <strong>of</strong> avoiding the placing <strong>of</strong> large-scaleequipment in stale air (diesel fumes, dust, other possible fumes) to the detriment <strong>of</strong> their resistanceover time.The shaft diameter is determined by ventilation requirements. The usable diameter is 10 m. It wouldallow a possible increase in ventilation capacity <strong>and</strong> limit energy expenses related to ventilation. Thestructure is divided into 3 compartments, one for each air exhaust. It is only equipped with equipmentfor inspections <strong>and</strong> maintenance.7.3.3 Personnel transfer shaft <strong>and</strong> construction shaftThis set <strong>of</strong> two shafts ensures the transfer <strong>of</strong> the other flows necessary for the construction, operation<strong>and</strong> closing <strong>of</strong> the <strong>repository</strong>. These shafts are also used for the entry <strong>of</strong> air for all the undergroundinstallations except for the package transfer shaft.In the architecture presented, one shaft is exclusively reserved for the transport <strong>of</strong> personnel <strong>and</strong> smallequipment. The other shaft, the construction shaft, ensures the extraction <strong>of</strong> broken rocks, the lowering<strong>of</strong> backfills in bulk, the descent <strong>of</strong> a surface-prepared concrete, the transfer <strong>of</strong> large-scale equipment,parts <strong>and</strong> building materials.The construction shaft can also serve as an emergency exit in case the personnel transfer shaft isunavailable.The equipment <strong>of</strong> these shafts is conventional equipment such as used in the mining industry. Cables<strong>and</strong> pipelines are also installed in these shafts.DOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM295/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!