10.07.2015 Views

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

Architecture and management of a geological repository - Andra

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6 – Overall underground architecture6.5.4 Examples <strong>of</strong> the preliminary sizing <strong>of</strong> the connecting infrastructuresThe preliminary sizing <strong>of</strong> the connecting infrastructures is illustrated by a few characteristic examplesin order to show the feasibility <strong>of</strong> the proposed principles.6.5.4.1 Infrastructure <strong>of</strong> the <strong>repository</strong> zone <strong>of</strong> the B waste packagesIn the B waste <strong>repository</strong> zone, the construction flows are moderate, while the package transfer flowsare more important. The disposal packages are relatively bulky <strong>and</strong> do not allow installing largesection air return ducts. The infrastructure consists <strong>of</strong> five drifts, comprising one reserved for air return<strong>and</strong> smoke removal, two for construction <strong>and</strong> two for package transfers.Figure 6.5.1Main infrastructure <strong>of</strong> a B waste <strong>repository</strong> zone6.5.4.2 Secondary infrastructure <strong>of</strong> the <strong>repository</strong> zone <strong>of</strong> the C waste packagesIn the C waste <strong>repository</strong> zone, the construction flows are important, while the package transfer flowsare less important. The size <strong>of</strong> the packages <strong>and</strong> their transfer cask is relatively small, <strong>and</strong> all the driftscan be equipped with air return <strong>and</strong>/or smoke removal ducts. An air return drift is not necessary. Theinfrastructure consists <strong>of</strong> four drifts, comprising three reserved for construction <strong>and</strong> one for packagetransfers.Figure 6.5.2Secondary infrastructure <strong>of</strong> a C waste <strong>repository</strong> zoneDOSSIER 2005 ARGILE -ARCHITECTURE AND MANAGEMENT OF A GEOLOGICAL DISPOSAL SYSTEM280/495

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!