10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OHM RemediationServices Corp. WORK PLANl Erosion <strong>and</strong> Sedimentation Control - OHM will establish controls to preventerosion <strong>and</strong> sedimentation through the use of sediment fencing. Section 4.1 of thisWP details the erosion <strong>and</strong> sedimentation control measures required by the State ofNorth Carolina.l Install Safety Fencing - OHM personnel will erect safety fencing aroundexcavations A, B, <strong>and</strong> C. Fencing will be 4 feet high, bright orange, polyethylene,mesh fence to prevent personnel from accidentally entering the open excavations.l Decontamination Areas - Personnel <strong>and</strong> equipment decontamination areas will beprovided within the Contamination Reduction Zones (CRZ) upon exiting thecontaminated <strong>work</strong>ing areas. The Site-Specific Health <strong>and</strong> Safety Plan addresses theseareas in detail.l Stockpile Area Preparation - The designated stockpile area will be cleared ofdebris <strong>and</strong> plastic sheeting will be spread on the asphalt pavement to temporarily store<strong>and</strong> separate the <strong>soil</strong> being excavated.lHealth <strong>and</strong> Safety Zones - The <strong>site</strong> will be segregated into <strong>work</strong> areas on the basisof degree of hazard <strong>and</strong> PPE requirements. Personnel <strong>work</strong>ing within thecontamination reduction zone (CRZ) will be required to wear the appropriate PPE asoutlined in the Site-Specific Health <strong>and</strong> Safety Plan. Excavation areas within the CRZwill be delineated by orange safety fencing. OHM health <strong>and</strong> safety personnel willprovide <strong>site</strong> air monitoring as specified in the SHSP <strong>and</strong> will adjust <strong>work</strong> zoneboundaries as appropriate.l Waste Characterization <strong>and</strong> Disposal Authorization - OHM will collectsamples from each of the three areas <strong>for</strong> disposal characterization. A disposal/treatmentfacility (or facilities) will then be identified <strong>for</strong> the acceptance of the contaminated <strong>soil</strong>which will be removed. All disposal documentation necessary will be prepared <strong>and</strong>will be provided to the NTR <strong>for</strong> approval <strong>and</strong> authorization as described in Section 6.4.l Common Fill Identification - A borrow area will be identified <strong>for</strong> the supply ofcommon fill <strong>for</strong> <strong>site</strong> restoration. Geotechnical samples will be collected <strong>and</strong> <strong>for</strong>wardedto the respective laboratories.l Monitor Well Ab<strong>and</strong>onment - Monitor wells within the <strong>remediation</strong> area that areto be removed will be identified. They will be ab<strong>and</strong>oned in accordance with State ofNorth Carolina regulations.OHM Project 16487WP Work Plsn May 199sIn<strong>for</strong>mation herein is pmpriaary <strong>and</strong> confidential <strong>and</strong> to be wed or released to others only with explicit written permission of OHM RemediationServices Corp.4-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!