10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OHM RemediationServices Corp. HEALTH AND SAFETY PLANfanning or applying wet towels. Provide fluid replacement every 15 minutes <strong>and</strong>refer <strong>for</strong> medical evaluation if not improved within 30 minutes. Symptoms include:Pale, cool, moist skinHeavy sweatingDizzinessNauseaFainting. Heat stroke - temperature regulation fails <strong>and</strong> the body core temperature rises tocritical levels. Immediate action must be taken to cool the body. Remove clothing<strong>and</strong> apply water while treating <strong>for</strong> shock during transport or while awaitingcompetent medical care. Competent medical care must be obtained immediately sincethis is a life threatening disorder. Symptoms include:Hot, dry skin, usually red, mottled or cyanotic104” temperature or higherConfusion, dizzinessLoss of consciousnessConvulsionsStrong, rapid pulseIt is recommended that <strong>work</strong>ers break at least every two hours <strong>for</strong> 10 to 15 minute rest periodswhen temperatures rise above 72.5 degrees F <strong>and</strong> protective clothing is worn. Ambienttemperatures will be determined from a Hg/glass thermometer shielded from radiant heat. Inaddition, <strong>work</strong>ers are encouraged to take rests whenever they feel any adverse effects that maybe heat-related. The frequency of breaks may need to be increased upon <strong>work</strong>er recommendationto the SSO <strong>and</strong> SS. Heat stress can be prevented by assuring an adequate <strong>work</strong>/restschedule; guidelines are printed below.AMBIENTTEMPERATURE LEVEL D PPELEVEL C PPE/MODIFIED LEVEL D I900 F or above I After 45 minutes of <strong>work</strong> I After 15 minutes of <strong>work</strong> I87.5 F-90 F After 60 minutes of <strong>work</strong> After 30 minutes of <strong>work</strong>82.5-87.5 F After 90 minutes of <strong>work</strong> After 60 minutes of <strong>work</strong>77.5-82.5 F After 120 minutes of <strong>work</strong> After 90 minutes of <strong>work</strong>72.5-77.5 F After 150 minutes of <strong>work</strong> After 120 minutes of <strong>work</strong>OHM Project 16487SSHSP Health <strong>and</strong> Safety Plan July 1995Infomation herein is proprietary <strong>and</strong> confidential <strong>and</strong> to be used or rclusal to others only with explicit writ@ permission of OHM Rancdiationh-“i~COQ.3-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!