10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table A-lSampling SummarySample Type Matrix SampleFrequency&FOXNo ofSamplesSamplingMethodSamplingEquipmentSampleContainersPESXVativesTAT’wLevelRequiredAnalysisAnalyticalMethod’HoldingTime’IncidentalWastesEquipmentRinseate BlanksWater Minimum 1,<strong>and</strong>asrequiredPrepared byfield team bycollectingdecon finalrinse waterN/A(2) 40 mlglass vialwith teflonlined(1) 1 literd=bottles withteflon-linedlidsCool toapprox4’CNFESCLevel ETCLPMetalsl3ll/6010,7060.77407470TCLP X240-131 1Volatiles volatileTCLP 8270-1311Semi-semi-Volatiles volatile6 months, except <strong>for</strong> Mercury-26clays10 daysExtract within 10 days, analyzewithin 40 daysSubsurfaceInvestigationSB-OI <strong>and</strong>Perimeter<strong>sampling</strong>SoilSoil 1 Once 4 <strong>soil</strong>borings-2 samplesfrom eachboring-I at 3-4 feetbelow thegroundsurface, <strong>and</strong>the otherabove thegroundwater/<strong>soil</strong> interfaceH<strong>and</strong> augertolfoot<strong>and</strong>collect thesampleadjacent toexisting ASTH<strong>and</strong> (1)402auger, SS glass withspx3ons or teflon-linedshovellid(I)802glass withtetlon-linedlidCool toapprox4’C1 ‘Idays NFESC TPH-GROLevel C (volatiles)5030/8015 IOdaysTPH-DRO 3550/8015 Extract within IO days, analyzewithin 40 daysSubsurfaceInvestigationTrip BlanksSoilWater1 percooler Minimum 1,<strong>and</strong>asrequiredPreparedlabbyN/A(l)NmJglass vialwith teflonlined=ptmCool toapprox4%7days NFESC TPH-GROLevel C (Volatile@5030/80 15 10 daysPage 9 of 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!