10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OHM RemediationServices Corp. HEALTH AND SAFETY PLAN7.5 AIR MONITORING LOGThe SSO will ensure that all air-monitoring data is logged into a monitoring notebook. Datawill include all in<strong>for</strong>mation identified in Procedure 12 of the Health <strong>and</strong> Safety ProceduresManual which will be maintained at the project <strong>site</strong> trailer by the SSO. The log will be signedby the individual conducting the monitoring daily. The Project CM will periodically reviewthis data7.6 CALIBRATION REQUIREMENTSThe PID, LEL/02 meter <strong>and</strong> <strong>sampling</strong> pumps required with fixed-media air <strong>sampling</strong> will becalibrated daily prior to <strong>and</strong> after each use. A separate log will be kept detailing date, time,span gas, or other st<strong>and</strong>ard, name <strong>and</strong> signature of person per<strong>for</strong>ming the calibration.7.7 AIR MONITORING RESULTSAir monitoring results will be posted <strong>for</strong> personnel inspection, <strong>and</strong> will be discussed duringmorning safety meetings.OHM Pmjcct 16487SSHSP Health <strong>and</strong> S&Q Plan July 1995In<strong>for</strong>mation herein is proprietary <strong>and</strong> confidential <strong>and</strong> to be used or released to c&en only with explicit writta) permission of OHM RanediationSeTvim Corp.7-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!