10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table A-lSampling SummarySample Type Matrix ApproxNo ofSamplesSamplingMethodSamplingEquipmentSampleContainersPreservativesTAT’QCLevelRequiredAnalysisAnalyticalMethod’HoldingTime’Characterization(Uncontaminated)SoilI per200cubic yards28 +3 dups or(10%)Compo<strong>site</strong> of SS spoon or (2) 4 02 Cool to ‘Idays NFESC TPH-GRO 5030/8015 10 days6 r<strong>and</strong>om shovel, glass with approx Level C (Volatiles)grabs SS bucket teflon-lined 4’Clids TPH-DRO 355018015 Extract within IO days, analyzewithin 40 days(2) 8 ozglass with TCLP 13111 180 days to TCLP ex@ I80 daysteflon-lined Metals 6010, after extq Mercury-28 days tolids 7060,774O TCLP extr, 28 days after extr.7470TCLPVolatilesTCLPSemi-Volatiles13 1118240 14daystoTCLPeti, 14daysaSerextr.131118270 I4 days to TCLP extr, 40 days atlerprep. extr.RCRA 1010 or Cyanide-14 daysHazardous 102oqWaste Char 90454set 7.3Characterization(Uncontaminated)Trip BlanksWater 1 per cooler Minimum 1,<strong>and</strong>asrequiredPreparedlabbyN/A (1)4Oml Cool toglass vial app~xwith tetlon- 4’C,linedseptum‘Idays NFESC TPH-GRO 5030/8015 lOdaysLevel C (Volatiles)TCLP 8240-131 I 10 daysVolatiles volatileconstituentsonlyPage 5 of 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!