10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table A-lSampling SummarySample Type Matrix SampleFrequencyApproxNo ofSamplesSamplingMethodSamplingEquipmentSampleContainersPreservativesTAT’QCLevelRequiredAnalysisAnalyticalMethod’HoldingTime’Characterization[Contaminated)SoilDeterminedby <strong>soil</strong>recyclingfacility orTSDF+5% dupsMin of 1 Compo<strong>site</strong> of SS spoon or (2) 4 02 Cool to ‘Idays NFESC TPH-GRO 5030/8015 10 days6 r<strong>and</strong>om shovel, SS glass with approx Level E (Volatiles)grabs bucket or teflon-lined 4’Cbowl lids TPH-DRO 3550/8015 Extract ’ within 10 days, analyzewithin 40 days(2) 8 ozglass with TCLP 1311/ 180 days to TCLP extr, 180 daysteflon-lined Metals 6010, after extq Mercury-28 days tolids 7060,774O TCLP extr; 28 days after extr.7470TCLPVolatilesTCLPsemi-Volatiles13 1118240 14daystoTCLPextr, 14daysaSerextr.13 1118270 14 days to TCLP extr, 40 days atIerprep. extr.RCRA 1010 or Cyanide-l 4 daysHazardous 102oA,Waste Char 9045%set 7.3Disposal(Soil RecyclingFacility)Soil I per 500cubic yards7 +I dup(5%)Compo<strong>site</strong> of SS spoon or (2) 4 02 Cool to 7 days NFESC TPH-GRO 5030/8015 IO days6 r<strong>and</strong>om shovel, SS glass with awox Level E (Volatiles)grabs bucket or teflon-lined 4°CbOW lids TPH-DRO 3550/8015 Extract within 10 days, analyzewithin 40 days(2) 8 oxglass with Oil <strong>and</strong> 9071 Not specifiedteflon-linedGreaselidsVolatiles+ 8240 10 daysBTEXPCBs 8080 Extract within 5 days, analyzewithin 40 daysTotal Lead 6010 6 monthsPage 3 of 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!