10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OHMRemediationconnection between the rash <strong>and</strong> the tick bite. The rash develops from three days toas long as a month after the tick bite. Almost one third of those with Lyme diseasenever get the rash.. Indigenous WildlifeIn addition to the preceding hazards, various native wildlife may be encounteredduring the per<strong>for</strong>mance of remedial activities. Spiders, snake bites, or other wildanimal bites will be reported immediately to the Site Safety Officer so that emergencymedical treatment may be sought immediately. Do not attempt to capture or restrainany animal, however, a physical description of the snake, spider, or other wildanimal will be helpful to the attending physician when administering treatment.3.3.4 Project Hazard CommunicationThe purpose of hazard communication (Employee Right-to-Know) is to ensure that the hazardsof all chemicals located at this field project <strong>site</strong> are transmitted (communicated) according to 29CPR 1926.59 to all OHM personnel <strong>and</strong> OHM subcontractors. OHM’s Corporate HazardCommunication Program is included in Appendix B <strong>for</strong> reference. Hazard communication willinclude the following:. Container LabelingOHM personnel will ensure that all drums <strong>and</strong> containers are labeled according tocontents. These drums <strong>and</strong> containers will include those from manufacturers <strong>and</strong>those produced on <strong>site</strong> by operations. All incoming <strong>and</strong> outgoing labels shall bechecked <strong>for</strong> identity, hazard warning, <strong>and</strong> name <strong>and</strong> address of responsible party.. Material Safety Data Sheets (MSDSs)There will be an MSDS located on <strong>site</strong> <strong>for</strong> each hazardous chemical known to beused on <strong>site</strong>. All MSDSs will be located in Appendix C of the SHSP. The <strong>site</strong>safety <strong>plan</strong> can be found in the project office trailer.. Employee In<strong>for</strong>mation <strong>and</strong> TrainingTraining employees on chemical hazards is accomplished through on ongoingcorporate training program. Additionally, chemical hazards are communicated toemployees through daily safety meetings held at OHM field projects <strong>and</strong> by an initial<strong>site</strong> orientation program.At a minimum, OHM <strong>and</strong> related subcontractor employees will be instructed on the following:. Chemicals <strong>and</strong> their hazards in the <strong>work</strong> area. How to prevent exposure to these hazardous chemicals. What the company has done to prevent <strong>work</strong>ers’ exposure to these chemicalsOHM Reject 16487SSHSF Health <strong>and</strong> Safety Plan July 1995In<strong>for</strong>mation herein is proprietary <strong>and</strong> confidential <strong>and</strong> to be used or r&ased to others only with explicit wtittaj permission of OHM RemediationServiced Corp.3-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!