10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.0 PROTECTIVE EQUIPMENTThis section addresses the various levels of personal protective equipment (PPE) which are ormay be required at this job <strong>site</strong>. OHM personnel are trained in the use of all PPE utilized.5.1 ANTICIPATED PROTECTION LEVELSuate au momtoring documentation in accordanceModified Level Dion in accordance with Section5.2 PROTECTION LEVEL DESCRIPTIO#SThis sections lists the minim urn requirements <strong>for</strong> each protection level. Modificationrequirements will be noted above.to these5.2.1 Level DLevel D consists of the following:llllSafety glasses with side shieldsHard hatSteel-toed <strong>work</strong> bootsWork clothing as prescribed by weatherOHM Project 16487SSHSPIn<strong>for</strong>mation herein is proprietary <strong>and</strong> confidentialHealth <strong>and</strong> Safety Plan<strong>and</strong> to be u~cd OI ?&%~ed to othet~ only with explicit writtep permission of OHMJuly 199s&mediationServices Corp.5-l

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!