10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OHM RemediationServices Corp. WORK PLAN10. After <strong>site</strong> is stabilized <strong>and</strong> permanent vegetation has been established, all erosion <strong>and</strong>sediment control structures may be removed.5.1.3 Maintenance Plan1. All erosion <strong>and</strong>’sediment control practices will be checked by OHM personnel <strong>for</strong>stability <strong>and</strong> operation following every run-off producing rainfall but in no case lessthan once every week. Any needed repairs will be made immediately to maintain allpractices as designed.2. Sediment will be removed from behind sediment fence when it becomes greater than1 foot deep at the fence. The sediment fence will be repaired as necessary to maintain abarrier.3. All seeded areas will be fertilized, reseeded as necessary, mulched <strong>and</strong> mowedaccording to specifications to maintain a vigorous, dense vegetation cover.4.5.Inspect check dams <strong>and</strong> channels <strong>for</strong> damage after run-off event.Anticipate submergence <strong>and</strong> deposition above the check dam <strong>and</strong> erosion from highflows around the edges of the dam. Correct all damage immediately. If significanterosion occurs between dams, install a protective riprap liner in that portion of thechannel.6. Remove sediment accumulated behind the dams as needed to prevent damage to channelvegetation, allow the channel to drain through the stone check dam, <strong>and</strong> prevent largeflows from carrying sediment over the dam. Add stones to darns as needed to maintaindesign height <strong>and</strong> cross section. Gravel will be cleaned or replaced when the checkdam no longer drains properly.5.2 STORMWATER MANAGEMENT PLANThe primary objective of the Stormwater Management Plan is to prevent the free <strong>and</strong>uncontrolled flow of water across the Exclusion Zone <strong>and</strong> contaminated stockpiles.Diversions <strong>and</strong> controls will prevent clean water from becoming contaminated <strong>and</strong> incurringadditional cost <strong>and</strong> ef<strong>for</strong>t to dispose (Figure 4). Clean water can be discharged to ditches.The secondary objective of the management is to identify what will be done with rainwater thatenters the excavation.The excavation will be controlled to prevent the flow of stormwater runoff from adjacent areasinto the excavation. This will be accomplished by the placement of berms <strong>and</strong>/or trenchesaround the perimeter of the excavation <strong>and</strong> stockpiles that will divert surface flows off <strong>site</strong> <strong>and</strong>OHM Project 16487WPIn<strong>for</strong>mation herein is proprietary <strong>and</strong> confidential<strong>work</strong> Plan<strong>and</strong> to bc used or rclused to others only with explicit written permission of OHMMay 199sRemediation SewicuCOrp.5-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!