10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.0 INTRODUCTIONThis Work Plan (WP) presents OHM Remediation Services Corp.‘s (OHM’s) approach <strong>for</strong><strong>soil</strong> <strong>remediation</strong> at Operable Unit (OU) No. 10, Site 35 Camp Geiger Area Fuel Farm, MarineCorps Base (MCB), Camp Lejeune, North Carolina. It has been prepared <strong>for</strong> presentation tothe Department of the Navy, Naval Facilities Engineering Comm<strong>and</strong>, Atlantic Division(LANTDIV) under Remedial Action Contract (RAC) Contract Number N 62470-93-D-3032.This document has been prepared in accordance with the following documents:lBasic Contractl NAVFAC Specification No. 05-94-4833, “Soil Remediation at Operable Unit No. 10,Site 35, Marine Corps Base Camp Lejeune, North Carolina” dated December 21,1994. “Final Basis of Design, Soil Remediation at Operable Unit No. 10, Site 35, MarineCorps Base Camp Lejeune, North Carolina” by Baker Environmental, Inc. datedDecember 21,1994lProject Drawings which are referred to as Project Documents.Additional detail, methods, or in<strong>for</strong>mation needed to enact this <strong>plan</strong> are covered in the ProjectDocuments.Several other <strong>plan</strong>s have been developed by OHM <strong>for</strong> this delivery order <strong>and</strong> are to beconsidered as integral components to this <strong>work</strong> <strong>plan</strong>. As such, they have been appended tothis <strong>plan</strong>.llSite Specific Health <strong>and</strong> Safety Plan (SHSP)Sampling <strong>and</strong> Analysis Plan (SAP)This WP identifies <strong>and</strong> describes how OHM will implement the major tasks encompassing the<strong>soil</strong> <strong>remediation</strong> <strong>for</strong> OU No. 10 in con<strong>for</strong>mance with the contract requirements. It includes thefollowing sections:Section 2.0Section 3.0Section 4.0Section 5.0Section 6.0Section 7.0Section 8.0Section 9.0Site BackgroundSite DescriptionSite Preparation <strong>and</strong> MobilizationSite Control PlansSite WorkSite Restoration <strong>and</strong> DemobilizationReportingProject ScheduleOHM Project 16487WP <strong>work</strong> Plan May 1995In<strong>for</strong>mation herein is proprietary <strong>and</strong> confidential <strong>and</strong> to be used or released to others only with explicit written permission of OHM RanediationServices Corp.l-l

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!