10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OHM RemediationServices Corp. SAMPLING AND ANALYSIS PLAN3.1.5 Field Screening of the Excavation WallsFollowing excavation of <strong>soil</strong>s down to the seasonal high level of the surficial aquifer, grabsamples will be collected every 50 linear feet of each sidewall <strong>for</strong> field screening. The walls ofthe excavation will be sloped <strong>and</strong> will there<strong>for</strong>e be accessible <strong>for</strong> <strong>sampling</strong> within in the hole.The first few inches within the walls will be discarded prior to collecting each grab sampleusing a clean SS spoon <strong>and</strong> placing enough volume of material into a clean SS bowl or bucket.The sample must be thoroughly mixed to obtain a relatively homogeneous mixture prior toIilIing the appropriate sample containers as specified in Appendix A, Table A-l.Sampling equipment will be thoroughly cleaned between samples using decontaminationprocedures described in section 3.5. Field <strong>sampling</strong> personnel will wear disposable glovesduring <strong>sampling</strong> <strong>and</strong> will change gloves between sample locations to minimize the potential <strong>for</strong>cross-contamination.The sample will be screened using a TPH immunoassay field-screening kit. If TPH is lessthan 100 mg/kg, a confirmation sample will be collected <strong>for</strong> off-<strong>site</strong> <strong>analysis</strong>. If TPH isgreater than 100 mg&g, the NTR will be in<strong>for</strong>med by the Project Manager to determine theadditional <strong>soil</strong> volumes to be excavated. Contaminated <strong>soil</strong>s will be removed untilgroundwater level is reached.3.1.6 Confirmation Sampling of the Excavation WallsFollowing attainment of negative results on the immunoassay field screening tests,confirmation grab samples will be collected every 50 linear feet of each sidewall <strong>for</strong> off-<strong>site</strong><strong>analysis</strong> of the parameters listed in Appendix A, Table A-l. The walls of the excavation willbe sloped <strong>and</strong> will be accessible <strong>for</strong> <strong>sampling</strong> within in the hole. The first few inches withinthe walls will be discarded prior to collecting each grab sample using a clean SS spoon <strong>and</strong>placing enough volume of material into a clean SS bowl or bucket. The sample must bethoroughly mixed to obtain a relatively homogeneous mixture prior to filling the appropriatesample containers as specified in Appendix A, Table A- 1. For volatile samples, arepresentative grab sample will be placed directly into the sample container.Sampling equipment will be thoroughly cleaned between samples using decontaminationprocedures described in section 3.5. Field <strong>sampling</strong> personnel will wear disposable glovesduring <strong>sampling</strong> <strong>and</strong> will change gloves between sample locations to minimize the potential <strong>for</strong>cross-contamination.3.1.7 Confirmation Sampling of Area DSubsurface Soil InvestigationIn January, 1994, a <strong>for</strong>mer fuel oil UST located along the north side of Building G480 wasexcavated <strong>and</strong> removed. Available records indicate that an undetermined volume of fuelcontaminated <strong>soil</strong> was encountered <strong>and</strong> excavated along with the UST. No documentationOHM +jcct 16?87SAP Sampling <strong>and</strong> Analysis Plm May 1995h&f;~or’h~c hfrctn IS proprietary <strong>and</strong> confidential <strong>and</strong> to bc used or rclcascd to others only with explicit writtm permission of OHM RancdiationIp3-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!