10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

OHM RemediationServices Corp. WORK PLANcontaminated or uncontaminated stockpile. The method <strong>and</strong> frequency of rapid immuno assaytesting is described in the SAP.The excavation process will continue until the predetermined limits are encountered in alldirections or until groundwater is encountered. No excavation wilI be per<strong>for</strong>med into thegroundwater table. If visual <strong>and</strong>/or field screening indicate that contaminated <strong>soil</strong> is presentbeyond the predetermined areas, OHM will consult the NTR <strong>for</strong> guidance. OHM will notexcavate any <strong>soil</strong> beyond those shown in Drawings C-2 <strong>and</strong> C-3 of the specifications withoutwritten authorization from the NTR.The results of the immuno assay testing wiIl direct the excavation activities. Samples will betaken of the walls of the excavations in accordance with the SAP. All methods frequencies,documentation <strong>and</strong> tests <strong>for</strong> the confirmation screening of the walls are described in the SAP.Should the screening results indicate <strong>soil</strong>s are below the TPH action levels, confirmationsamples will be collected <strong>for</strong> off-<strong>site</strong> analyses as described in the SAP. If the indicated <strong>soil</strong>sare above the TPH action limits, then excavation will continue as authorized by the NTR.Because the removal of contaminated <strong>soil</strong> may create an excavation greater than 4 feet deep, theslopes of the excavation will be observed <strong>for</strong> stability <strong>and</strong> fulfillment of OSHA regulations.They will sloped to an angle of no less than 1.5 horizontal:1 vertical preventing the need <strong>for</strong>bracing <strong>and</strong> shoring.6.2 TRANSPORT TO STOCKPILE AND STOCKPILINGAll trucks used <strong>for</strong> transporting contaminated <strong>soil</strong> <strong>and</strong> uncontaminated <strong>soil</strong> within the exclusionzone will be decontaminated be<strong>for</strong>e leaving the exclusion zone. The loaded trucks willtransport all <strong>soil</strong> to the stockpile area along the route shown in Figure 2 <strong>and</strong> Drawing C-2 ofthe design drawings. The entire route is paved <strong>and</strong> the drivers will be instructed not to deviatefrom the haul route preventing the accidental spreading of contaminated <strong>soil</strong>. Should dustbecome a concern, the route will be dampened with water or deposits will be brushed orshoveled from the route. The trucks will deposit their loads of <strong>soil</strong> in the stockpiles asinstructed by the technicians who per<strong>for</strong>med the petroleum hydrocarbon screening. Tominimize cross-contamination, the trackhoe will attempt to h<strong>and</strong>le only contaminated oruncontaminated <strong>soil</strong> <strong>for</strong> extended periods of operation. Also, if it becomes necessary truckscan be dedicated to hauling just one type of payload.The stockpile area shown on Figure 2 <strong>and</strong> Drawing C-2 of the design drawings is a paved areawhich will be covered with polyethylene to prevent contact with clean pavement <strong>and</strong> easeremoval when loading <strong>for</strong> disposal or treatment. The stockpiles will be clearly labeled withsigns <strong>and</strong> flagging. Contaminated <strong>soil</strong> areas will be flagged with red tape <strong>and</strong> uncontaminated<strong>soil</strong> areas will be flagged with yellow tape. Both contaminated <strong>and</strong> uncontaminated <strong>soil</strong>OHM Project 16487WP <strong>work</strong> Plan May 199sIafommion herein is proprietary <strong>and</strong> confidential <strong>and</strong> to be used or nkased to others only with explicit written permission of OHM Remcdiation Sew&sCOIQ.6-2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!