10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table A-lSampling Summarykunple Type Matrix SampleFrequencyApproxNo ofSampleSSamplingMethodSampling Sample PreseN- TAT’ QC Required Analytical Holding Time’Equipment Containers atives Level Analysis Method’:ield Blank Water 1 per sourceper event <strong>for</strong>all levels <strong>and</strong>all snalytesMinimum 1.<strong>and</strong>asrequiredPrepared bytield teamN/A (2) 40 ml Cool toglass vial awoxwith teflon- 4°Clinedseptum(6) 1 literglasJbttleswithteflon-linedlids14 days NFESCLevel CTPH-GRO 5030/8015 lOdays(Volatilcs)TPH-DRO 3550/8015 Extract within 10 days, analyzewithin 40 daysTCLP 13111 6 months except Mercury-26 daysMetals 6010,1060,174O7470TCLP 8270-1311 Extract within 10 days, analyzeSI%tli- semi- within 40 daysVolatiles volatileconstituentsRCRA 1010 or cyanide-14 daysHazardous 102oqWaste Char 9045qset 7.3Oil <strong>and</strong>Grease9071 Not specifiedVolatiles 8240PCBs 808010 daysExtract within 5 days, analyzewithin 40 daysTotal Lead 6010 6 monthsCharacterization(on-<strong>site</strong> screening)SoilIpertruckload819 +41 dups(5%)1 Compo<strong>site</strong> SSspoonor (1)402 Cool to 24 hours Screen TPH Proposed 10 daysof 5 grabs shovel, SS glass with approx OdY (iuno- Methodper truckload bucket or teflon-lined 4°C assay field 4030bOWl lids screening-WPage 2 of 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!