10.07.2015 Views

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

work plan for soil remediation, sampling and analysis plan, site ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table A-lSampling SummarySample TypeMatrixSampleFrequencyApproxNo ofSamplesSamplingMethodSamplingEquipmentSampleContainersPreservativesTAT’wLevelRequiredAnalysisAnalyticalMethod’HoldingTime*Conthmation-Off-<strong>site</strong>(Closure)SoilOneperlinear feetalong eachwall of theexcavation,a&r fieldscreeningArea A:13 +1 dup’ or(IO%)Area B:I+I dup’ or(10%)Grabss spoonsor shovel,SS bowl orbucket(1)402glass withteflon-linedlid(1) 8 oxglass withteflon-linedlidCool toapprox4°C3daysNFESCLevel CTPH-GRO(Volatiles)TPH-DRO5030/80153550/8015IOdaysExtract within 10 days, analyzewithin 40 daysArea C:10 +1 dup’ or(10%)Contirmation-OK<strong>site</strong>Trip BlanksWaterI per coolerMinimum 1,<strong>and</strong>asrequiredPreparedlabbyN/A(1)4Omlglass vialwith teflonlinedseptumCool toapprox4°C3days NFESC TPH-GROLevel C (Volatiles)5030/8015 lOdaysContirmation-Off-<strong>site</strong>EquipmentRimeate BlanksWater1 wWMinimum 1,<strong>and</strong>asrequiredPrepared byfield team bycollectingdecon finalrinse waterN/A(2) 40 mlglass vialwith teflonlinedseptum(1) 1 liter&=bottles withteflon-linedlidsCool toapprox4°C3daysNFESC TPH-GROLevel C (Volatiles)TPH-DRO5030/80153550/8015IO daysExtract within 5 days, analyzewithin 40 daysPage 7 of 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!