OHM RemediationServices Corp. HEALTH AND SAFETY PLANPotentialHazardsStock by, Against HeavyEquipment, Flying Debris.Protruding ObjectsH<strong>and</strong>ling Heavy ObjectsSlips, Trips, FallsHazard Control Measures. Use reflective warning vests when exposed to vehicular traffic. Isolate equipment swing areas. Make eye contact with operators be<strong>for</strong>e approaching quipment. Restrict entry to the woric area to authorized personnel. Wear hard hats. safety glasses with side shields, or splash/face shields <strong>and</strong> goggles. <strong>and</strong> steel-toesafetybootsatautimes. Observe pmper lifting techniques. Obey sensible lifting limits (60 pounds maximum per person manual lifting). Use mcchsnical lifting quipmeot (h<strong>and</strong> carts, trucks) to move large awkward loads. Do not exceed quipmenticrane load specifications when hoisting loads. Do not suspend loads over grouod pcno~el. L%eoergim or shut off utility lines at their soulct be<strong>for</strong>e wo& begins. Use double insulated or properly grounded electric power-operated tools. Provide an equipment-grounding conductor program or employ ground-fault circuit interrupters. Use qualified electricians to hook up electrical circuits. Inspect all extension cords daily <strong>for</strong> structural integrity, ground continuity, <strong>and</strong> damaged insulation. Cover or elevate electric wire or flexible cord passing through <strong>work</strong> areas to protect from damage. Keep all plugs, cords. <strong>and</strong> receptacles out of water. Use approved water-proof, wither-proof type if exposure is likely. Inspect all electrical power circuita prior to commencing <strong>work</strong>. Follow Lockouflagout procedurcx in accottlance with OHM Health <strong>and</strong> Safety Pmceduuns Manual. Clear walkways of equipment, construction debris <strong>and</strong> other materials. Mark. identify or barricade other obstructiaos. Use body harness <strong>and</strong> lifeline when worLing 6 feet or more above the ground. Use approved laddera in accordance with OHM Health <strong>and</strong> Safety Procedures ManualOHM Pmject 16487SSHSP Health <strong>and</strong> Safety Plan July 1995In<strong>for</strong>mation herein is pmprietary <strong>and</strong> confidential <strong>and</strong> to be used or mlused to others only with explicit writt~ permission of OHM RanediationServices Corp.3-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!