10.07.2015 Views

1E9Ct5D

1E9Ct5D

1E9Ct5D

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

A party interested in obtaining a distribution, storage, or transport permit must providethe CRE with a petition containing the following:a) The corporate name and domicile of the petitioner;b) A certified copy of the corporate charter and bylaws as amended or the documentationthat proves its legal existence;c) The documents that prove the representative capacity and powers of the legal representative;d) The purpose, description, and technical specifications of the project;e) The description of the safety methods and procedures regarding the operation andmaintenance of the system;f) The documentation showing the technical viability of the project;g) The documents that demonstrate the petitioner’s technical, administrative, andfinancial capacity;h) The investment plans and the minimum investment commitments, including thestages and timeframes for carrying them out;i) The proposal for general conditions and rates regarding services;j) A copy of the notice to be presented to the Federal Competition Commission(Comisión Federal de Competencia) that manifests the petitioner’s intention to obtaina distribution, transportation, or storage permit;k) A description of the operating conditions, the computer and information networksystems, and the mechanisms and equipment that will be utilized for open accessto third parties;l) The date on which the petitioner will begin providing services, specifying, if applicable,each phase of the project’s development.261Regulated ActivitiesRegarding transportation services, in addition to the previously mentioned requirements,the petition should contain:a) The proposed range of services;b) The project’s transportation capacity;c) A description of the different types and forms of services and their market;d) A demonstration of the potential demand for services;e) The sources of gas supply;f) Any transportation agreements made with specific customers;g) A diagram of gas flow routes;h) Any effects of the proposed project on the corresponding transportation system.If storage services are offered, the petition should include:a) The location and characteristics of the project;b) The storage capacity of the project.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!