10.07.2015 Views

1E9Ct5D

1E9Ct5D

1E9Ct5D

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

274C H A P T E R X Vconsidered important for purposes of completing the petitioner’s file, for the filing ofthe technical-descriptive log, and for the substantiation of the project to be developed,which should include the elements referred to in Section II of Article 83 in detail.Once the data and documents referred to in the previously mentioned article arereceived, the SENER will, within 30 business days, reach a decision on the petition and,if it is approved, will issue the permit.The permit holders will be subject to the following obligations:a) To not sell, re-sell or otherwise alienate, either directly or indirectly, any capacityor electricity, except where authorized by the Law and the RLSPEE;b) To notify the SENER of the date on which the construction work has been finishedwithin 15 business days of such date;c) To the extent possible and with compensation, to provide the electricity needed forpurposes of public consumption when, due to an Act of God or circumstancesbeyond human control, regular service has been interrupted or restricted, only forthe time period in which such regular service is unavailable;d) To comply with the legal and regulatory provisions, as well as the official Mexicanstandards and any other applicable provisions regarding works and facilities subjectto permits;e) To operate and maintain its equipment and facilities in conditions that do not posea risk to the permit holder or third parties;f) Once the operation of the facilities begins, and for the exclusive purpose of statisticsgathering,to inform the SENER, using the format determined by the Ministry, of thetype and volume of fuel used and the quantity of electricity generated, specifyingthe quantity used to satisfy the permit holder’s own needs and the quantity deliveredto the CFE or destined for exportation, as well as, if applicable, the importationof electricity.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!