LBi-3: Construction Indoor Air Quality Management<br />

Intent To implement construction practices that promote a high degree of indoor air quality (IAQ)<br />

for construction workers and building occupants.<br />

Credit<br />

Requirements<br />

Awarding<br />

Credit Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

GENERAL<br />

Demonstrate the development and implementation of a comprehensive Construction IAQ<br />

Management Plan. At a minimum the plan must address the following:<br />

� Source Control;<br />

� <strong>Building</strong> Flush Out; and<br />

� Resuming Normal <strong>Building</strong> Operation.<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

CREDIT POINTS REQUIREMENTS<br />

2<br />

Design <strong>Rating</strong><br />

(maximum)<br />

2 Develop a construction IAQ plan<br />

2<br />

Construction <strong>Rating</strong><br />

(maximum)<br />

2 Implement the construction IAQ plan<br />

� Construction IAQ Management Plan;<br />

� Completed IAQ Planning Checklists and evaluations of proposed control measures as<br />

per Appendix C of SMACNA IAQ guidelines for occupied buildings under construction;<br />

and<br />

� Assessment of the duration required for pre-occupancy flush-out as follows:<br />

� Estimation of pre-occupancy flush-out based on likely ambient conditions<br />

according to the project schedule.<br />

� Estimation of pre-occupancy flush-out based on the most onerous ambient<br />

conditions to demonstrate possible maximum impact of project delays.<br />

� Construction IAQ Management Plan, if amended from Design <strong>Rating</strong> submission;<br />

� Completed IAQ Planning Checklists and evaluations of proposed control measures (if<br />

changed from the Design <strong>Rating</strong> stage) as per Appendix C of SMACNA IAQ guidelines for<br />

occupied buildings under construction, 2007, 2nd Edition. Provide a summary report<br />

detailing the reasons for each change;<br />

� Time stamped photographs demonstrating the storage and protection of all absorptive<br />

materials from moisture damage; and<br />

� Summary report including:<br />

� IAQ Inspection Checklists as per Appendix D of SMACNA IAQ guidelines for occupied<br />

buildings under construction, 2007, 2nd Edition. Include time stamped<br />

photographic evidence taken by the site supervisors showing each installed control<br />

measure. Weekly photos must be provided at a minimum;<br />

� Time stamped photographic evidence of the building cleaning phase prior to<br />

occupancy;<br />

� Results of the HVAC testing and balancing phase;<br />

� Ambient humidity levels during the building flush-out period, including<br />

demonstrable results of the fresh air delivery rate and duration of both the preoccupancy<br />

and post-occupancy flush-out phases; and<br />

� Demonstrable results of how the air conditioning systems have been reset<br />

according to the building design basis for ongoing operation.<br />