Calculations and<br />

Methodology<br />

References None<br />

� Evidence of purchase and installation of these materials in the project in the form<br />

of invoices from suppliers and installers.<br />

� The ‘furthest point of origin’ is the longest distance to the project site from (1) the<br />

point of extraction, harvest or recovery or (2) the point of manufacture.<br />

� The distance traveled is calculated as (‘Distance traveled by road or rail’ + 0.1 x<br />

‘Distance traveled by sea’)<br />

� For composite materials, a weighted average by weight (mass) must be applied to<br />

the distance. This calculation is not necessary for materials where one major<br />

constituent represents at least 90% of the final material by weight.<br />

� Where materials or primary constituent elements are quarried, extracted, or<br />

harvested, the calculation begins at this point and includes the distance traveled to<br />

the manufacturing/processing facility.<br />

� Where products are primarily comprised of recycled materials (i.e. 90% by weight<br />

or more), the calculation begins at the point of manufacture.<br />

� Calculations to include distance to site but do not include returns.<br />

� Total Material Cost: exclude labor and equipment costs and include the following<br />

divisions from the Construction Specifications Institute (CSI) MasterFormatTM or<br />

equivalent: Division 03 Concrete, Division 04 Masonry, Division 05 Metals, Division<br />

06 Wood, Plastics, and Composites, Division 07 Thermal and Moisture Protection,<br />

Division 08 Openings, Division 09 Finishes, Division 10 Specialties, Division 31<br />

Earthwork, Division 32 Exterior Improvements. It is optional to also include Division<br />

12; however, associated costs have to be carried throughout all Stewarding<br />

Materials credits.<br />