Awarding Credit<br />
Points<br />
Credit<br />
Submission:<br />
Design <strong>Rating</strong><br />
Credit<br />
Submission:<br />
Construction<br />
<strong>Rating</strong><br />
CREDIT POINTS REQUIREMENTS<br />
4<br />
Design <strong>Rating</strong><br />
(maximum)<br />
1-2 Stormwater management system is designed to meet<br />
Quantity Control criteria as per Credit Requirements.<br />
1 Stormwater management system is designed to meet<br />
Quality Control criteria as per Credit Requirements.<br />
1 An OMP has been developed.<br />
4<br />
Construction <strong>Rating</strong><br />
(Maximum)<br />
1-2 Stormwater management system components are<br />
constructed to meet Quantity Control criteria as per<br />
Credit Requirements.<br />
1 Stormwater management system components are<br />
constructed to meet Quality Control criteria as per<br />
Credit Requirements.<br />
1 An OMP has been updated.<br />
� Narrative describing the stormwater management system developed for the project<br />
including:<br />
� Drawings showing locations of components of the stormwater management<br />
system;<br />
� Civil engineering calculations describing and quantifying the stormwater<br />
management strategies, specifically addressing the pre-development and postdevelopment<br />
peak runoff rate and quantity; and<br />
� Extracts from specifications and product data sheets describing the<br />
components specified, confirming that the system is capable of collecting 90%<br />
of stormwater and is able to treat to the required quality standards.<br />
� OMP for ongoing site best management practices to uphold system integrity. The<br />
plan shall include:<br />
� An inspection schedule for the stormwater management system to assure its<br />
continued operation as designed;<br />
� The proposed person(s), organization, or entity responsible for the continued<br />
operation and maintenance of the stormwater management system;<br />
� Operating budgets and funding mechanism for the support of continued<br />
maintenance of the stormwater management system;<br />
� Methods for ensuring neighborhood developments will not be adversely<br />
affected by the project’s stormwater strategy; and<br />
� Erosion plan to prevent excessive onsite erosion and to any receiving water<br />
courses.<br />
� CV of qualified Civil Engineer<br />
� As built drawings showing locations of the applied components of the stormwater<br />
management system;<br />
� Updated civil engineering calculations describing and quantifying the stormwater<br />
management strategies, specifically addressing the pre-development and postdevelopment<br />
peak runoff rate and quantity; and<br />
� Manufacturers product data sheets for the purchased components, confirming that<br />
the system is capable of collecting 90% of stormwater and is able to treat to the<br />
required quality standards;<br />
<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 136 of 223