Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

CREDIT POINTS REQUIREMENTS<br />

4<br />

Design <strong>Rating</strong><br />

(maximum)<br />

1-2 Stormwater management system is designed to meet<br />

Quantity Control criteria as per Credit Requirements.<br />

1 Stormwater management system is designed to meet<br />

Quality Control criteria as per Credit Requirements.<br />

1 An OMP has been developed.<br />

4<br />

Construction <strong>Rating</strong><br />

(Maximum)<br />

1-2 Stormwater management system components are<br />

constructed to meet Quantity Control criteria as per<br />

Credit Requirements.<br />

1 Stormwater management system components are<br />

constructed to meet Quality Control criteria as per<br />

Credit Requirements.<br />

1 An OMP has been updated.<br />

� Narrative describing the stormwater management system developed for the project<br />

including:<br />

� Drawings showing locations of components of the stormwater management<br />

system;<br />

� Civil engineering calculations describing and quantifying the stormwater<br />

management strategies, specifically addressing the pre-development and postdevelopment<br />

peak runoff rate and quantity; and<br />

� Extracts from specifications and product data sheets describing the<br />

components specified, confirming that the system is capable of collecting 90%<br />

of stormwater and is able to treat to the required quality standards.<br />

� OMP for ongoing site best management practices to uphold system integrity. The<br />

plan shall include:<br />

� An inspection schedule for the stormwater management system to assure its<br />

continued operation as designed;<br />

� The proposed person(s), organization, or entity responsible for the continued<br />

operation and maintenance of the stormwater management system;<br />

� Operating budgets and funding mechanism for the support of continued<br />

maintenance of the stormwater management system;<br />

� Methods for ensuring neighborhood developments will not be adversely<br />

affected by the project’s stormwater strategy; and<br />

� Erosion plan to prevent excessive onsite erosion and to any receiving water<br />

courses.<br />

� CV of qualified Civil Engineer<br />

� As built drawings showing locations of the applied components of the stormwater<br />

management system;<br />

� Updated civil engineering calculations describing and quantifying the stormwater<br />

management strategies, specifically addressing the pre-development and postdevelopment<br />

peak runoff rate and quantity; and<br />

� Manufacturers product data sheets for the purchased components, confirming that<br />

the system is capable of collecting 90% of stormwater and is able to treat to the<br />

required quality standards;<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 136 of 223