SM-2: Design for Materials Reduction<br />
Intent To reduce the overall amount of material used in the development of buildings.<br />
Credit<br />
Requirements<br />
Awarding Credit<br />
Points<br />
Credit<br />
Submission:<br />
Design <strong>Rating</strong><br />
Credit<br />
Submission:<br />
Construction<br />
<strong>Rating</strong><br />
Calculations and<br />
Methodology<br />
References None<br />
GENERAL<br />
Demonstrate that fewer materials are used in the final building design than in a typical<br />
building of the same type by achieving at least one of the following initiatives:<br />
� At least 90% of the interior floor area does not include finishes (apart from<br />
sealant);<br />
� At least 90% of the ceiling area does not have any ceiling systems (exposed ceilings<br />
only); or<br />
� Use of dual function surfaces or materials such as:<br />
o <strong>Building</strong> Integrated Photovoltaics (BIPV) replacing traditional building<br />
envelope materials on at least 10% of the area of the building envelope<br />
(including roof);<br />
o Vegetated roofs on at least 50% of the area of roof. (Plant selection should<br />
favor native and drought-resistant species. This section of the roof must<br />
also be accessible to building users); or<br />
o Vegetated walls on at least 10% of the area of all interior partitions (Plant<br />
selection should favor native and drought-resistant species).<br />
ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />
Office<br />
Office buildings must achieve at least two of three initiatives from the list above.<br />
CREDIT POINTS REQUIREMENTS<br />
1<br />
(maximum)<br />
1<br />
1<br />
(maximum)<br />
1<br />
Design <strong>Rating</strong><br />
General: <strong>Building</strong> is designed with at least one material<br />
reduction initiative.<br />
Offices only: At least two initiatives are required.<br />
Construction <strong>Rating</strong><br />
General: <strong>Building</strong> is constructed with at least one material<br />
reduction initiative.<br />
Offices only: At least two initiatives are required.<br />
� Brief narrative describing how the project intends to meet the Credit<br />
Requirements, including any calculations; and<br />
� Extracts from specifications requiring the proposed initiative(s).<br />
� Updated brief narrative describing how the project intends to meet the Credit<br />
Requirements, including any calculations; and<br />
� Calculations and photographs of the relevant features confirming the initiatives<br />
meet credit requirements.<br />
Area calculations are required and must show a comparison between a traditional<br />
approach and current design using reduced amount of materials.<br />
<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 179 of 223