12.01.2013 Views

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

CREDIT POINTS REQUIREMENTS<br />

6<br />

(maximum)<br />

4<br />

2<br />

6<br />

(maximum)<br />

4<br />

2<br />

Design <strong>Rating</strong><br />

Prepare a Habitat Creation or Restoration Strategy; and<br />

Allocate an on-site or off-site habitat creation or restoration site<br />

of minimum areas as defined above.<br />

Demonstrate that through collaboration, off-site ecological<br />

corridors have been designed to link similar habitat types.<br />

Construction <strong>Rating</strong><br />

Demonstrate on-site or off-site habitat creation or restoration<br />

equivalent the Credit Requirements.<br />

Demonstrate that through collaboration, off-site ecological<br />

corridors have been created to link similar habitat types.<br />

For Habitat Creation and/ or Restoration Credits:<br />

� Habitat Creation or Restoration Strategy, including:<br />

� calculations;<br />

� photographs and maps illustrating habitat creation areas or pre-existing natural<br />

resource areas requiring restoration;<br />

� plant palette highlighting the proposed species;<br />

� methodology for habitat creation or restoration of functional habitat;<br />

� KPIs for assuring performance through monitoring and management; and<br />

� maps illustrating any connections between habitats.<br />

For Ecological Corridors Credits:<br />

� Ecological/ landscape report and plant palette describing the design of the<br />

ecological corridors and proposed species off-site, with details of native and<br />

adaptive plant species;<br />

� Drawings highlighting the location and area coverage of the off-site ecological<br />

corridors and habitat areas connected by the corridors, as appropriate;<br />

� Confirmation of the agreement with neighboring land owner to reserve and<br />

permanently protect land and create ecological corridors; and<br />

� Details of monitoring and management requirements for minimum 10 years for<br />

ecological corridors (to be incorporated into NS-R3).<br />

For Habitat Creation and/ or Restoration Credits:<br />

� Plans, narrative and photographic evidence of implementation of Habitat Creation<br />

or Restoration Strategy; and<br />

� Documentation of any failures identified during construction and proposed<br />

rectification strategies of habitat creation/ restoration.<br />

For Ecological Corridors Credits:<br />

� Photographs and as built landscape drawings clearly indicating the ecological<br />

corridors and planted species.<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 47 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!