LBo-5: Private Outdoor Space<br />

Intent To improve the occupiers quality of life by providing private outdoor space.<br />

Credit<br />

Requirements<br />

Awarding Credit<br />

Points<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

GENERAL<br />

This credit is only applicable to residential developments.<br />

Demonstrate that a private outdoor space is provided for at least 90% of the residential<br />

units. This space must be equal in size to at least 10% of the internal floor area of its<br />

associated unit and be a minimum of 2.0m wide x 3.0m long.<br />

To qualify for the credit, the private external spaces must have the<br />

following characteristics:<br />

� Be directly adjacent to and directly accessible from the unit;<br />

� 95% of the balconies must be at least 90% shaded from direct sunlight for a<br />

minimum of three hours between 9am and 5pm, as measured on 21 st July; and<br />

� Include a facility for drying clothes outdoors in a visually shielded area.<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

CREDIT POINTS REQUIREMENTS<br />

1<br />

(maximum)<br />

1<br />

1<br />

(maximum)<br />

1<br />

Design <strong>Rating</strong><br />

Residential Only: Provide 90% of units with outdoor amenity<br />

space as per the Credit Requirements<br />

Construction <strong>Rating</strong><br />

Residential Only: Provide 90% of units with outdoor amenity<br />

space as per the Credit Requirements<br />

� Brief narrative describing how the project meets the Credit Requirement, including<br />

calculations demonstrating compliance with the space requirement;<br />

� Floor plan for all unit layouts clearly indicating size of the unit and the outdoor<br />

space, the location of outdoor space, access from the unit and design details of<br />

clothes drying area;<br />

� Drawings of the façade, plans, balconies, projections and shading devices including<br />

materials;<br />

� Evidence of any design features to mitigate or control solar penetration or climatic<br />

extremes (e.g. double skin envelopes); and<br />

� Report including a detailed hour by hour summary, including computer model<br />

snapshots, of each balcony floor for each of the three successful shaded hours.<br />

� Updated narrative describing how the project meets the Credit Requirement,<br />

including calculations demonstrating compliance with the space requirement;<br />

� As built typical floor plan for all unit layouts clearly indicating size of the unit and<br />

the outdoor space, the location of outdoor space, access from the unit and design<br />

details of clothes drying area;<br />

� As-built drawings of the façade, plans, balconies, projections and shading devices<br />

(including materials) and any other design features to mitigate or control solar<br />

penetration or climatic extremes (e.g. double skin envelopes); and<br />

� Report including a detailed hour by hour summary, including computer model<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 63 of 223