12.01.2013 Views

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

Pearl Building Rating System - Estidama

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LBi-4: Car Park Air Quality Management<br />

Intent To facilitate the provision of adequate air quality within enclosed car parks.<br />

Credit<br />

Requirements<br />

Requirement<br />

Achievement<br />

Credit<br />

Submission:<br />

Design <strong>Rating</strong><br />

Credit<br />

Submission:<br />

Construction<br />

<strong>Rating</strong><br />

GENERAL<br />

Demonstrate that the ventilation design meets or exceeds requirements for pollutant<br />

concentrations in car parks. This will be achieved via continuous measurement of the<br />

following pollutants:<br />

Air Pollutant Averaging Time Maximum concentration<br />

Carbon Monoxide (CO) 15 minutes 100 mg / m 3<br />

Nitrogen Dioxide (NO2) 1 hour 200 �g/m 3<br />

Particular Matter PM10 24 hours 50 �g/m 3<br />

Where the project does not contain any enclosed car parks (75% enclosure), the credit is<br />

automatically awarded.<br />

ADDITIONAL REQUIREMENT/CLARIFICATIONS<br />

None<br />

CREDIT POINTS REQUIREMENTS<br />

1<br />

(maximum)<br />

1<br />

1<br />

(maximum)<br />

1<br />

Design <strong>Rating</strong><br />

Ensure car parking ventilation design meets the credit<br />

requirements.<br />

Construction <strong>Rating</strong><br />

Ensure car parking ventilation design meets the credit<br />

requirements.<br />

� Brief narrative describing how the project intends to meet the credit criteria;<br />

� Drawings or extracts from specifications indicating the proposed location of air<br />

quality sensors, outdoor air intakes and outlets, and the air quality alert system;<br />

and<br />

� BMS point schedules.<br />

� Update narrative describing how the project meets the credit criteria;<br />

� Description and as-built drawings of all air quality sensors, outdoor air intakes and<br />

outlets, and the air quality alert system; and<br />

� Commissioning report showing appropriate calibration, set-points and control<br />

sequences (as relevant) of all air quality sensors and alert systems.<br />

<strong>Pearl</strong> <strong>Building</strong> <strong>Rating</strong> <strong>System</strong>: Design & Construction, Version 1.0, April 2010 95 of 223

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!